On-time delivery is a key indicator of a GRC manufacturer's overall strength. Through 28 years of lean production practice, Qinglong GRC manufacturer has maintained an on-time delivery rate above 98% for five consecutive years, establishing a solid reputation for contract performance in the industry.
This high on-time rate stems from a well-developed production management system. In the renovation project of Century Plaza in Shanghai, faced with the complex process of translucent GRC panels with a 55% hollow-out rate, Qinglong used the MES system for precise production scheduling, breaking the production process down into 187 control nodes, and ultimately completed delivery 5 days ahead of schedule. The project's “early warning-response” mechanism intervenes in advance on factors that could affect the schedule, keeping progress under control. In particular, in a landmark project in Qianhai, Shenzhen, when confronted with sudden design changes, the production team recovered the schedule through flexible dispatching while ensuring quality, securing the project's key milestones.
An Advanced Planning and Scheduling system (APS) is adopted to formulate optimal production plans by comprehensively considering equipment capacity, material supply, and multiple other factors. The plan achievement rate remains stable at above 95%.
A collaborative platform has been established with 86 core suppliers to achieve on-time material delivery. Through a supplier assessment mechanism, the on-time rate of raw material supply is ensured at 99%.
An exception handling mechanism has been established: equipment failures are responded to within 4 hours, and quality anomalies are handled within 2 hours. This rapid response capability ensures smooth production.
Through a three-shift production system and flexible production lines, monthly capacity can be adjusted between 30,000 and 80,000 square meters. This capacity flexibility shows clear advantages in handling urgent orders.
On-time delivery requires systematic support. It is recommended to focus on the manufacturer's production management system and emergency handling capabilities.