The delivery time of GRC products is a key concern for customers, and reasonable delivery scheduling reflects a manufacturer's production management capability. Drawing on 28 years of project experience, Qinglong GRC manufacturer has established a scientific production planning system, controlling delivery at 30-45 days for standard products and 60-75 days for complex custom products.
In the Wuhan Hanxiu Theater project, faced with the production task of 15,000 square meters of special-shaped GRC panels, Qinglong adopted "concurrent engineering" management: design, mold making, and production preparation proceeded simultaneously, shortening the conventional 90-day delivery period to 68 days. The project used an ERP system for precise production scheduling, breaking the production process down into 285 control nodes, and monitored production progress in real time through the MES system. This refined management has kept the on-time delivery rate above 98.5% for five consecutive years.
Delivery time is mainly affected by product complexity, order volume, and seasonal factors. Qinglong effectively balances various orders through capacity reservation and flexible production. In the Poly series projects, average delivery time was shortened to 35 days through order combination optimization.
An emergency production mechanism has been established to accept urgent orders with delivery within 15 days. During the Guangzhou pandemic, a medical project urgently needed GRC partition wall panels. Qinglong activated a green channel and completed production and shipment in 7 days, ensuring the project schedule.
Measures such as supplier collaborative inventory and safety capacity settings ensure delivery reliability. The on-time delivery rate has remained above 98.5% for five consecutive years, and this stability has won customer trust.
The critical path method is used to optimize production processes, and an early warning mechanism has been established. Daily production meetings coordinate resources to ensure seamless coordination across all stages. This management approach has proven highly effective in major projects.
Delivery time requires scientific management. Customers are advised to agree on reasonable delivery times with manufacturers based on actual project needs and to choose partners with well-established production management systems.