The delivery time of GRC products is a key concern for customers, and reasonable delivery scheduling reflects a manufacturer's production management capability. Qinglong, a GRC manufacturer with 28 years of project experience, has established a scientific production planning system, controlling standard product delivery within 30-45 days and complex custom products within 60-75 days.
In the Wuhan Han Show Theater project, facing the production task of 15,000 square meters of specially shaped GRC panels, Qinglong applied "concurrent engineering" management: design, mold making, and production preparation proceeded simultaneously, shortening the usual 90-day delivery period to 68 days. The project used an ERP system for precise production scheduling, breaking the production process into 285 control nodes, with real-time monitoring of production progress through a MES system. This refined management has kept the on-time delivery rate above 98.5% for five consecutive years.
Delivery time is mainly affected by product complexity, order volume, and seasonal factors. Qinglong effectively balances various orders through capacity reservation and flexible production. In the Poly series projects, average delivery time was shortened to 35 days through order portfolio optimization.
An emergency production mechanism has been established to accept urgent orders with delivery within 15 days. During the Guangzhou pandemic, when a medical project urgently needed GRC partition wall panels, Qinglong activated a green channel, completing production and shipment in 7 days to ensure project progress.
Reliability of delivery is ensured through measures such as supplier collaborative inventory and safety capacity settings. The on-time delivery rate has remained above 98.5% for five consecutive years, and this stability has won customer trust.
The critical path method is adopted to optimize the production process, and an early-warning mechanism has been established. Daily production meetings coordinate resources to ensure seamless connection between all stages. This management approach has proven highly effective in major projects.
Delivery time requires scientific management. Customers are advised to agree on reasonable delivery schedules with manufacturers based on actual project conditions, and to choose partners with well-developed production management systems.