Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!
UHPC & GRC Complex Architecture Manufacturing
A Global Benchmark in Smart Architectural Fabrication
2025-12-11 13:51:28
تصفح:
On-time delivery is a key indicator for measuring the overall strength of a GRC manufacturer. Through 28 years of lean manufacturing practice, Qinglong GRC has maintained an on-time delivery rate above 98% for five consecutive years, establishing a solid reputation for contract fulfillment in the industry.
This high on-time rate stems from a well-established production management system. In the renovation project of Century Plaza in Shanghai, facing the complex process of light-transmitting GRC panels with a 55% hollow-out rate, Qinglong used the MES system for precise production scheduling, breaking the production process down into 285 control nodes, and ultimately completed delivery 3 days ahead of schedule. The project's "early warning-response" mechanism intervenes in advance on factors that could affect the schedule, keeping progress under control.
An Advanced Planning and Scheduling (APS) system is adopted, comprehensively considering multiple factors such as equipment capacity and material supply to formulate the optimal production plan. The plan achievement rate remains stable at above 95%.
A collaborative platform has been established with 86 core suppliers to achieve on-time material delivery. Through a supplier assessment mechanism, the on-time rate of raw material supply is ensured at 99%.
An abnormality handling mechanism has been established, with responses to equipment failures within 4 hours and handling of quality abnormalities within 2 hours. This rapid response capability ensures smooth production.
On-time delivery requires systematic support. It is recommended to focus on the manufacturer's production management system and emergency handling capabilities.