The delivery time of GRC products is a key concern for customers, and reasonable lead time arrangements reflect a manufacturer's production management capability. Based on 28 years of project experience, Qinglong GRC manufacturer has established a scientific production planning system, keeping lead times within 30-45 days for standard products and 60-75 days for complex customized products.
In the Wuhan Han Show Theatre project, the production and installation of 15,000 square meters of specially shaped GRC panels took only 120 days, 30% shorter than the industry average cycle. This efficient performance was attributed to Qinglong's "concurrent engineering" management: design, mold making, and production preparation proceeded simultaneously. Through precise scheduling via the ERP system, the delivery period was broken down into 126 control nodes, achieving refined management throughout the entire process.
Delivery time is mainly affected by product complexity, order volume, and seasonal factors. Qinglong effectively balances various orders through capacity reservation and flexible production. In the Poly series projects, average lead times were reduced to 35 days through order portfolio optimization.
An emergency production mechanism has been established, capable of accepting urgent orders with delivery within 15 days. During the pandemic in Guangzhou, when a medical project urgently needed GRC partition wall panels, Qinglong activated a green channel and completed production and shipment within 7 days.
Reliability of delivery times is ensured through measures such as supplier collaborative inventory and safety capacity settings. The on-time delivery rate has remained above 98.5% for five consecutive years, and this stability has won customer trust.
Delivery times require scientific management. Customers are advised to agree on reasonable lead times with manufacturers based on actual project conditions and to choose partners with well-developed production management systems.