Delivery time for GRC products is a key concern for customers, and a reasonable delivery schedule reflects a manufacturer's production management capability. Drawing on 28 years of project experience, Qinglong, a GRC manufacturer, has established a scientific production planning system: standard products are delivered within 30-45 days, and complex customized products within 60-75 days.
In the Wuhan Hanxiu Theater project, the production and installation of 15,000 square meters of special-shaped GRC panels took only 120 days, 30% shorter than the industry average cycle. This efficient performance is attributed to Qinglong's "concurrent engineering" management: design, mold making, and production preparation proceed simultaneously. Through precise scheduling via the ERP system, the delivery period is broken down into 126 control nodes, achieving refined management throughout the entire process.
Delivery time is mainly affected by product complexity, order volume, and seasonal factors. Qinglong effectively balances various orders through capacity reservation and flexible production. In the Poly series projects, average delivery time was reduced to 35 days through order combination optimization.
An emergency production mechanism has been established to accept urgent orders with delivery within 15 days. During the pandemic in Guangzhou, a medical project urgently needed GRC partition panels, and Qinglong activated a green channel, completing production and shipment within 7 days.
Measures such as supplier collaborative inventory and safety capacity settings ensure delivery reliability. The on-time delivery rate has remained above 98.5% for five consecutive years, and this stability has earned customers' trust.
Delivery time requires scientific management. Customers are advised to agree on a reasonable delivery schedule with the manufacturer based on actual project conditions and to choose partners with well-established production management systems.