UHPC Panel Joint Gap Width Allowance Guide: Qinglong Installation Standards

2025-11-11 11:50:02

Click:

The reserved width of UHPC panel joint gaps directly affects the waterproofing performance, deformation adaptability, and appearance of the curtain wall, and must be scientifically determined based on material properties, environmental conditions, and installation requirements. Qinglong Group, an enterprise with full-chain installation experience, draws on 28 years of engineering practice to provide a professional guide to joint gap width reservation.

I. Core Design Bases for Joint Gap Width Reservation Joint gap width reservation must follow three core bases: first, thermal expansion and contraction compensation—the linear expansion coefficient of UHPC panels is approximately 10×10⁻⁶/°C, so sufficient space must be reserved to accommodate the expansion and contraction caused by temperature changes; second, installation tolerance compatibility—to offset minor errors in panel production and keel installation and ensure flush joints; third, waterproofing requirements—the gap width must meet the effective bonding width of the sealant to prevent waterproofing failure. The design should reference the industry standard "Ultra-High Performance Concrete (UHPC) Exterior Wall Panels" and the climate parameters of the project location.

II. Joint Gap Width Standards for Standard and Special Scenarios Under standard conditions (inland areas, building height ≤50m, panel width ≤2.5m), the reserved joint gap width for UHPC panels is 10-15mm, with the effective sealant bonding width ≥8mm and the backer rod diameter 2-3mm wider than the gap to ensure full sealing. Special scenarios require targeted adjustments: in coastal areas with high temperatures and humidity, where temperature variations are large and rainfall is abundant, the reserved gap width is 12-18mm; high-rise buildings (≥50m) are significantly affected by wind, so the reserved gap width is 15-20mm, along with enhanced tear resistance of the sealant; for the jointing of extra-large panels (panel width ≥3m), the reserved gap width is 18-25mm to accommodate greater expansion and contraction. In the Shanghai Century Plaza renovation project, Qinglong reserved 20mm joint gaps for extra-large UHPC panels 3.2m wide, which have operated for many years without deformation or leakage problems.

III. Qinglong's Gap Reservation and Construction Assurance Measures Qinglong adopts a "precise calculation + on-site fine-tuning" approach for gap reservation. In the early stage, BIM technology is used to simulate thermal deformation and calculate the theoretical gap width; during on-site installation, fine adjustments of ±2mm are made based on real-time temperature and the actual flatness of the keel. During construction, dedicated gap positioning fixtures are used to ensure uniform width and avoid inconsistent gaps; neutral silicone or polyurethane sealant with strong compatibility with UHPC panels is selected, and bonding tests are conducted before construction. In the Guangxi New Media Center project, Qinglong used these measures to ensure consistent width across thousands of UHPC panel joints, achieving excellent waterproofing performance with no leakage after years of exposure to rain. In addition, Qinglong designs drip edges or drainage channels on the outer side of the gaps to further enhance waterproofing reliability.

The reserved joint gap width for UHPC panels must be scientifically adapted to the scenario and requirements, avoiding gaps that are too large or too small, which would affect performance. With its extensive installation experience and precise calculation capabilities, Qinglong Group provides customized gap reservation solutions for different projects. Choosing a supplier with hands-on installation experience is the core guarantee for ensuring the quality and long-term stability of UHPC panel joints.

0
UHPC Panel Joint Gap Width Allowance Guide: Qinglong Installation Standards
Long by picture save/share
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

National service hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.