Delivery guarantee is a reflection of a GRC manufacturer's project management capabilities. Through 28 years of lean production practice, Qinglong GRC has established a scientific contract performance assurance system, with an on-time delivery rate maintained above 98% for five consecutive years.
In the Wuhan Han Show Theater project, faced with the complex production task of red curved GRC panels, Qinglong used its MES system for precise production scheduling, breaking the production process down into 285 control nodes. When raw material supply was delayed due to the pandemic, the emergency mechanism was activated immediately, ensuring uninterrupted production through safety stock and supplier coordination. The project was ultimately delivered 5 days ahead of schedule, and this performance capability earned high praise from the owner. The company's "early warning-response" mechanism intervenes in advance on factors that may affect the construction schedule, shifting from after-the-fact remediation to proactive prevention—a proactive management approach that has achieved remarkable results in multiple major projects.
An ERP system is used for whole-process planning management, establishing an integrated control system covering "order-purchasing-production-shipping." With safety stock settings and capacity reservations, the plan achievement rate remains stable above 95%.
A collaboration platform has been established with 86 core suppliers to achieve on-time material delivery. Through a supplier evaluation mechanism, the raw material supply punctuality rate reaches 99%. This assurance is especially important during supply chain fluctuations.
58 quality control points ensure a high first-pass yield. A full inspection system avoids delays caused by rework—this quality stability is the foundation of delivery guarantees. Quality data is entered into the system in real time, allowing problems to be detected and resolved early.
A rapid response mechanism for handling anomalies has been established: equipment failures are resolved within 4 hours, and quality issues are addressed within 2 hours. Backup capacity is maintained to ensure on-time delivery even under exceptional circumstances.
Delivery guarantee requires systematic support. It is recommended to focus on evaluating the manufacturer's production management system and emergency response capabilities.