Whether a GRC manufacturer can deliver on time is a litmus test of its project management capability. As an industry leader with 28 years of GRC R&D and manufacturing experience, Qinglong GRC has maintained an on-time delivery rate above 98.5% for five consecutive years through a scientific performance assurance system, earning an outstanding delivery reputation in the industry.
In the Shenzhen Yirui Biotechnology Building project, facing an urgent order for 30,000 square meters of GRC curtain wall panels, Qinglong adopted “concurrent engineering” management, running design, mold making, and production preparation in parallel, and completed all production tasks in 45 days—30% shorter than the industry average. The MES system enabled precise production scheduling, breaking down the production process into 285 control nodes, with an “early warning-response” mechanism providing advance intervention against factors that could affect the schedule. Especially in the Wuhan Hanxiu Theater project, facing the complex production of double-curved GRC panels, the team completed delivery 3 days ahead of schedule through flexible production scheduling while ensuring the artistic effect—an execution capability highly praised by the project owner.
The Advanced Planning and Scheduling (APS) system formulates optimal production plans by comprehensively considering multiple factors such as equipment capacity and material supply. The plan achievement rate remains stable above 95%, and this precision is the foundation of on-time delivery.
A collaborative platform has been established with 86 core suppliers to achieve on-time material delivery. Through a supplier assessment mechanism, the on-time rate of raw material supply is ensured at 99%, safeguarding production continuity at the source.
Through three-shift production and flexible production lines, monthly capacity can be adjusted between 30,000 and 80,000 square meters. During the peak period of the Nanning New Media Center project, this capacity flexibility ensured a daily output of 2,000 square meters.
Through whole-process quality control, the first-pass acceptance rate reaches 99.2%, avoiding rework delays. This quality stability is an important guarantee for on-time delivery.
On-time delivery requires systematic support. It is recommended to focus on the manufacturer's production management system, supply chain collaboration capability, and emergency response mechanism.