On-time delivery is a key indicator of a GRC manufacturer's overall strength. Through 28 years of lean production practice, Qinglong GRC has maintained an on-time delivery rate above 98% for five consecutive years, establishing an excellent delivery reputation in the industry.
This high on-time rate stems from a well-established production management system. In the Century Plaza renovation project in Shanghai, facing the complex process of light-transmitting GRC panels with a 55% openwork rate, Qinglong used the MES system for precise production scheduling, breaking the production process into 285 control nodes, and ultimately completed delivery 3 days ahead of schedule. The project adopted an "early warning-response" mechanism, intervening in advance against factors that could affect the schedule, ensuring progress remained under control.
The Advanced Planning and Scheduling System (APS) takes multiple factors into comprehensive consideration, such as equipment capacity and material supply, to formulate optimal production plans. The plan achievement rate has remained stable at above 95%.
A collaborative platform has been established with 86 core suppliers to achieve on-time material delivery. Through a supplier assessment mechanism, the on-time rate of raw material supply is ensured at 99%.
An exception handling mechanism has been established, with equipment failures responded to within 4 hours and quality issues resolved within 2 hours. This rapid response capability ensures smooth production.
On-time delivery requires systematic support. It is recommended to focus on examining the manufacturer's production management system and emergency handling capabilities.