GRC installation is a systematic project that must be carried out strictly according to standardized procedures. Drawing on 28 years of project experience, the Qinglong GRC manufacturer has summarized scientific and rational installation steps to ensure controllable installation quality and optimal efficiency.
In the Shanghai Century Plaza renovation project, the Qinglong team divided GRC installation into four major stages—preparation, measurement, installation, and acceptance—refined into 16 standard steps. The project first conducted a site survey, using 3D scanning technology to obtain precise data; then carried out measurement and setting out, establishing a three-dimensional control network; next installed the steel framework using an adjustable system; and finally installed the panels in a top-down sequence. This scientific process arrangement increased installation efficiency by 40%, with a first-time acceptance pass rate of 99.8%.
Familiarize yourself with the drawings and plans, and conduct technical briefings. Check component numbering and verify dimensions and quantities. Prepare construction tools and equipment, and arrange the construction site. This stage must be meticulous and thorough to ensure smooth subsequent work. Comprehensive preliminary preparation is the foundation of successful installation.
Establish a measurement control network and use a total station for precise positioning. Snap installation lines and mark panel numbers. Recheck substrate dimensions and adjust installation tolerances. Measurement accuracy directly determines installation quality and must be strictly controlled. Adopt advanced measurement techniques to ensure precision meets standards.
Install in numbered sequence, starting with the reference panels. Adjust position and elevation, temporarily fix, then fix permanently. Inspect and adjust promptly to ensure installation accuracy. This stage must be executed strictly according to the plan with strengthened process control. Implement the three-inspection system to ensure every procedure passes.
Conduct final inspections and resolve any issues found. Clean the joints and apply sealing. Remove construction facilities and complete site cleanup. This stage must be strictly monitored to ensure delivery quality. A thorough acceptance procedure is the final guarantee of quality.
A scientific installation process is the guarantee of quality. Through standardized procedures and strict control, the Qinglong GRC manufacturer ensures that every project meets installation quality standards.