Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
  • عربي
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

How a GFRC Component Factory Handles Cornices, Square Columns, Roman Columns, and Entrance Features: Twelve Control Points from Detailed Design to Factory Acceptance

2026-11-18 15:29:44

Click:

1. Why the Same Rendering Turns Out So Differently After Installation

In hotels, hospitals, schools, and cultural-tourism landscape projects, cornices, square columns, Roman columns, and entrance features are almost the 'face' of the facade. Many projects run into the same letdown: the rendering shows full, well-proportioned moldings and upright lines, but once installed on site they look 'puffy,' 'sagging at the waist,' 'misaligned at the joints,' and 'patchy with color differences.'

Collecting and reviewing a large number of rework cases reveals that the problem usually does not lie in 'whether the shape is beautifully designed,' but concentrates in three skipped links:

First, the geometric basis was never agreed. A rendering gives only the visual form, not the controlling dimensions, division boundaries, and allowable deviations, so the factory and the site each interpret it in their own way.

Second, the positions of the division joints were decided arbitrarily. Division joints are the 'layout lines' of shaped components; where a joint falls determines whether the appearance reads continuously, and also whether the component can be demolded and transported.

Third, the sample has no hold-point authority. A sample is made but not written into the contract as a hold point, so batch production carries on as before and the sample degrades into a photo.

The production chain for GFRC (glass-fiber-reinforced cement) components is long, and any link out of control leaves traces on the finished product that are hard to reverse. Therefore, when discussing 'how to make it more beautiful,' a more practical approach is to translate aesthetic requirements into verifiable technical clauses.

2. First, Distinguish Them: The Difficulties of the Four Component Types Are Not the Same

Treating these four component types as one category of 'line products' is a common misjudgment. Their appearance risks and technical control points differ greatly.

Component Type

Main Appearance Risk

Key Technical Control Point

Common Failure Manifestation

Cornice and cornice molding

Not straight along its length, joint misalignment, wall-face staining

Joint positioning, drip detail, top drainage slope, support spacing

Black staining under the eaves, undulating moldings, sagging at the projecting end

Square column and column cladding

Column looks bulky, vertical joint falls on the front face, capital and base different colors

Taper and chamfer, division joints at reentrant corners or molding breaks, full-height verticality

Seam in the middle of the front face, color difference between capital and shaft, upper-lower misalignment

Roman column

Distorted proportions, inconsistent number and depth of flutes, obvious mold parting lines

Confirmation of order proportions, entasis curve, mold parting-surface position, inner-cavity grouting

Stiff column with no entasis, blurred volutes from molding, hollow sound when tapped

Entrance feature

Proportion imbalance at human scale, reverse drainage slope, nowhere to route services

Viewing-distance review, load-transfer path, drip and drainage, embedding and reservations

Oversized pediment coping, ponding on the canopy, later drilling damaging the finish

 

3. Build 'Good-Looking' on 'Non-Deforming' First: The Material and Performance Baseline

GFRC uses cement, alkali-resistant glass fiber, aggregate, admixture, and water as its main components; alkali-resistant glass fiber is the tensile reinforcing phase, while the cement matrix provides compressive strength and formability.

Hard indicators on the material side:

• When Portland cement is used, the zirconia (ZrO₂) content of alkali-resistant glass fiber should not be less than 16.5% (JC/T 940—2022 Clause 6.2). Ordinary glass fiber that achieves 'alkali resistance' merely through a surface coating is not alkali-resistant glass fiber.

• The grade of alkali-resistant glass-fiber roving may be judged per JC/T 572 (Class L ZrO₂≥14.0%, Class H ZrO₂≥16.0%); alkali-resistant glass-fiber mesh may be judged per JC/T 841.

• Back-attached steel frames, fasteners, embedded parts, and connectors should receive anti-corrosion treatment or be made of stainless steel; hot-dip galvanizing quality may be controlled per GB/T 13912, with the coating thickness determined per design requirements.

Finished-product performance side (JC/T 940—2022 'Glass-Fiber-Reinforced Cement (GFRC) Decorative Products,' applicable to non-load-bearing products, divided into Class Ⅰ and Class Ⅱ):

Performance Indicator

Class Ⅰ

Class Ⅱ

Volumetric density / (g/cm³)

≥ 2.0

≥ 1.8

Compressive strength (out-of-plane) / MPa

≥ 40.0

≥ 40.0

Ultimate flexural strength / MPa

≥ 18.0

≥ 10.0

Tensile strength / MPa

≥ 7.0

≥ 5.0

Impact strength / (kJ/m³)

≥ 12.0

≥ 8.0

Water absorption / %

≤ 8.0

≤ 10.0

Freeze resistance

No delamination, spalling, or other damage after freeze-thaw cycles (100 cycles in severe-cold regions, 75 in cold regions, 50 in other regions)

Same as left

 

Compressive strength, ultimate flexural strength, tensile strength, and impact strength are properties of the product's structural layer. Performance test methods follow GB/T 15231—2023 'Test Methods for the Properties of Glass-Fiber-Reinforced Cement.' Note the test age: when rapid-hardening sulfoaluminate cement or rapid-hardening high-iron sulfoaluminate cement is used, the specimen age should be greater than 3 d; when Portland cement is used, it should be greater than 28 d — check the age first when reading a report, otherwise the numbers are not comparable.

A common misconception that needs correcting: carbonation is not deterioration. GFRC is usually not reinforced with steel bars, so the carbonation front reaching a certain depth does not constitute a structural event; after the pH of the pore solution in the carbonated zone drops, the erosion rate of the alkali on the glass fiber actually decreases. What truly determines long-term performance is the density of the matrix and the alkali-resistance grade of the fiber, not 'whether it has carbonated.'

4. Eight Links on the Factory Side

1. Shape detailed design and division: break a large-volume shape into units that can be demolded, transported, and hoisted; determine division-joint positions (preferably at texture breaks, reentrant corners, or concealed faces), and clarify the demolding angle and how negative angles are handled. Complex shapes are often confirmed with 3D scanning and 1:1 foam mock-ups.

2. Mold making: commonly FRP molds, silicone molds, plaster molds, steel molds, and wooden molds; regular moldings can use steel molds repeatedly, while doubly curved surfaces and deep reliefs usually require CNC-machined molds. Mold ownership should be written into the contract — this is usually the more economical and feasible path for making the same components years later.

3. Forming: common industry practice has two types, the spray method and the premix method. It should be noted that JC/T 940—2022 no longer classifies products by forming process (the 2004 version had such a classification); process selection falls within the technical agreement between the two parties.

4. Curing: temperature and humidity control directly affects early strength and shrinkage. Insufficient curing produces delayed cracks after installation.

5. Demolding and trimming: demolding too early causes damage to edges and corners, too late increases the difficulty of demolding. Trimming should use unified tools and techniques to avoid leaving inconsistent grinding marks.

6. Embedded parts and back-attached steel frames: position accuracy determines whether on-site installation can be completed correctly the first time, and anti-corrosion treatment determines whether rust contamination of the finish appears later.

7. Surface treatment and protection: the texture (stone-like, fair-faced, sandblasted and acid-washed, etc.) and protective coating should keep a consistent process within the same batch.

8. 1:1 pre-assembly: large-volume or shaped components are pre-assembled before leaving the factory according to the installation layout; this is the link where finding cumulative errors costs the least.

5. How to Make Each of the Four Component Types Look Better

5.1 Cornice: Think Clearly First About 'Where People View It From'

A cornice is a component viewed from below; the appearance focus is on the underside contour and the drip line, not the decorative line on the front elevation.

• Moldings should have a clear hierarchy. A classical cornice usually consists of several layers such as the dentil band, the corona, and the main cornice; viewed from below, these form alternating light and dark horizontal shadows. If all the moldings are made the same height, they blur into one mass when seen from below.

• The drip detail cannot be omitted. A drip groove or bird's-beak should be provided under the eaves to stop rainwater from running back along the underside. Most vertical black staining on walls is related to a missing drip or a drip groove that is too shallow.

• The top face should have an outward drainage slope, to avoid long-standing ponding on the top leaking toward the interior or the wall side.

• Joints should align with the building's divisions. When dividing along the length, joint positions should preferably align with axis spacing, curtain-wall divisions, or window-opening edges, to avoid 'half-block' staggered joints.

• Reserved joints should avoid three-sided bonding. Expansion joints should be provided where different materials meet; the joint is filled with a foamed backer rod before the weather-resistant sealant is applied, to prevent three-sided bonding from tearing the sealant.

• Fix the insulation thickness first, then the projection and the closing detail. Changes in insulation thickness directly affect the cornice closing node; reversing the order results in on-site cutting.

5.2 Square Column: Joint Position Matters More Than Joint Width

• A slight taper or small chamfer noticeably improves the appearance. A purely straight square column easily looks bulky from below; giving the shaft a very slight taper and the external corners small chamfers reduces the sense of mass while preserving the square feel.

• Division joints should fall at reentrant corners or molding breaks, avoiding leaving a seam dead center on the front face. The common 'two-half embrace' approach to column cladding should specify the mold parting seam at the reentrant corners on both sides.

• Full-height columns need verticality checks section by section. Cumulative errors are amplified at the capital, and the junction between the capital and the main structure most readily reveals any tilt.

• Base, shaft, and capital should preferably be produced in the same batch. Differences in cement batches, curing conditions, and surface treatment between batches are a major source of color difference.

• Decide on dry hanging versus bonding first. Dry hanging should preserve ventilation and drainage gaps and clarify the hanger system; if a curtain-wall system is involved, note that the applicable panel list of JGJ 336—2016 'Technical Code for Engineering of Artificial Panel Curtain Walls' does not include GFRC, so it is usually used in combination with JGJ/T 423—2018; the specific applicable relationship should be written into the design documents.

5.3 Roman Column: Proportion, Entasis, and the Parting Surface

The 'spirit' of a Roman column comes from its proportions and entasis, not from piling up the number of flutes.

• Order proportions (per the common proportional ranges of the classical orders; the design drawings govern in each case): a Doric column's height is about 5–6 times its base diameter, Ionic about 8–9 times, Corinthian about 9–10 times; Tuscan about 7 times. Once the proportion deviates, the appearance immediately 'feels wrong.'

• Number of flutes: Doric commonly 20, Ionic and Corinthian commonly 24. Columns on the same facade should be kept consistent.

• Entasis is the key. The shaft usually tapers slowly upward from about the lower third of its height, swelling slightly in the middle, with the top diameter generally tapering to about 4/5–5/6 of the base diameter. Making it a pure cylinder of equal diameter top and bottom is the main reason a Roman column looks stiff.

• The capital is a difficult over-molded piece. Ionic volutes and Corinthian acanthus leaves require clear parting design, and the parting surface must not fall on the front-facing side; a physical small sample should be made for confirmation when necessary.

• Hollow columns need a check of grouting density. After the inner steel skeleton is lined, grouting is required; insufficient fullness causes a hollow sound when tapped and a risk of ponding and freeze expansion.

• The parting seam of the two-half mold should be smoothly ground, with the seam line specified to fall within a flute or at a reentrant corner.

5.4 Entrance Feature: Human Scale Requires a Viewing-Distance Review

The entrance is the part viewed from the closest distance, and proportional relationships on the drawing are magnified on site.

• Review molding scale by the standing viewing distance. The pediment height, the width of the door-casing moldings, and the arch rise should each be judged once more against the actual viewing distance, in addition to the rendering.

• The load-transfer path must be clear. The self-weight and wind loads of pediments, arches, and canopies need a clear transfer path confirmed by structural design; GFRC decorative products are non-load-bearing and do not carry the main structural forces.

• The canopy top face drains outward and the underside has a drip, the same as for the cornice.

• Lighting, signage, and access openings should be positioned at the mold stage. Later drilling damages the finish and protective layer and is hard to restore to consistency.

• Left-right symmetric pieces should be over-molded and numbered in pairs. If the left and right pieces of a door casing come from different molds or different batches, the symmetric appearance easily goes wrong.

6. From 'Can Be Made' to 'Can Be Installed': Size, Division, and Transport

Consideration

Common Practice

Note

Single-piece size

Reverse-calculated from transport limits and hoisting capacity

Over-limit pieces require advance verification of the travel route and restricted-travel hours

Single-piece weight

Matched to the capacity of on-site hoisting equipment

The limits of tower cranes, truck cranes, and manual handling differ greatly

Joint design

Falls at texture breaks, reentrant corners, or concealed faces

The joint position determines both appearance continuity and demolding feasibility

Numbering and layout drawing

Each piece corresponds to an independent number and installation axis

Unnumbered components are almost impossible to install efficiently on site

Stacking and transfer

Standing or on dedicated pallets, avoiding long-span suspension

Long strip components laid flat with suspension easily develop latent cracks

 

The transport link is often underestimated: the restricted hours and zones for large trucks in cities, and the limits of cross-river and cross-sea passages on vehicle and cargo size and weight, all need to be factored into the division at the detailed-design stage, rather than figured out only just before leaving the factory.

7. Surface Effects and Color-Difference Control

• Lock the same technical conditions for the same project: raw-material brands and batches, mix design, curing conditions, and surface-treatment process should be kept consistent; any mid-course change requires re-sealing of samples.

• Visual Mock-Up (VMU): addresses 'whether it looks right' — color, texture, joint width and joint shadow, flatness, and corner closing. It should be observed under natural light close to the actual orientation; once confirmed, sign and retain the control sample and keep it until actual completion, as the judgment basis for all delivered components. Making only color plates and not segmented physical mock-ups cannot reflect splicing continuity or joint-width uniformity.

• Production Mock-Up (PMU): should contain one vertical joint, one horizontal joint, one corner, and one opening or penetrating element — these positions are the high-incidence points of actual leakage and deformation.

• The sample must be written in as a hold point: no batch production without approval, and remediation, re-testing, and cost attribution after a failure should be agreed in advance. Writing it merely as a 'deliverable' without hold-point effect renders the system ineffective.

• Acceptance viewing distance: per JC/T 940—2022, appearance defects are visually inspected at 1 m from the surface, and color difference at 6 m from the surface. Writing this into the contract can eliminate a great deal of subjective dispute.

• A protective layer does not replace structural waterproofing. Exposed faces may receive hydrophobic or weather-resistant protection, but node waterproofing, drainage structures, and the sealant system still require independent design.

8. Installation and Anchoring: Flexible Connection Is Not a Detail

JGJ/T 423—2018 'Technical Standard for the Application of Glass-Fiber-Reinforced Cement (GFRC) in Buildings' points out that GFRC has a more pronounced humidity effect than concrete, so the connection between the GFRC panel and the back-attached steel frame should avoid rigid connection, with flexible connection preferred. The typical structural requirements of the L-shaped flexible anchor rod are as follows:

Structural Element

Requirement

Anchor-rod material

Hot-dip galvanized steel bar or stainless steel

Anchor-rod diameter

Generally 6 mm or 8 mm

Arrangement

Mutually parallel and arranged horizontally, with the toe direction pointing toward the geometric centerline of the panel

Anchoring method

Embedded-anchored with the panel, root exposed, foot length 80–90 mm, ensuring free rotation

Bonding-disc size

About (160–180) mm × (90–100) mm

Bonding-disc effective area

Generally not less than 160 cm²

Bonding-disc thickness

Not less than 1.5 h (h is the panel thickness)

Effective length

Not less than 100 mm

Clear distance to the steel frame

Minimum distance between the bonding-disc surface and the underside of the back-attached steel frame not less than 13 mm

Connection to the steel frame

Generally welded, with a weld length not less than 25 mm or determined by weld-strength calculation; a hinged connection may be used where there are special anti-corrosion requirements or the panel height is very large

 

The gravity anchor consists of a pair of anchor rods arranged in a triangle with the steel frame; the number is determined by structural calculation but is not less than the number of columns of flexible anchors. Component edges should be made with reinforcing ribs; too small a span-to-height ratio may fail due to insufficient interlaminar shear strength, while too large a span-to-height ratio makes the reinforcing-rib section oversized and uneconomical; both value boundaries should be watched in design.

9. Acceptance and Testing: Writing 'Good-Looking' into Verifiable Clauses

• Factory inspection: usually covers appearance, dimensional deviation, ultimate flexural strength, volumetric density, water absorption, and other items; the same raw materials and the same process form one inspection lot.

• Type inspection: covers all items, triggered at new-product finalization, major changes in materials or process, resumption after a long production stop, once a year in normal production, and so on.

• Testing commissioning entity: per 'Measures for the Administration of Quality Testing of Construction Projects' (MOHURD Order No. 57, effective March 1, 2023), testing institutions should obtain qualifications and operate within the permitted scope; per the common interpretation of local housing-construction authorities, a test report issued by a testing institution not commissioned by the construction entity cannot serve as project quality acceptance material. A manufacturer self-inspection report may serve as a capability reference but cannot replace testing commissioned by the construction entity.

• Witnessed sampling: 'Provisions on the Implementation of Witnessed Sampling and Testing in Building Engineering and Municipal Infrastructure Engineering' (Jian Jian [2000] No. 211) requires that, for test blocks, specimens, and materials involving structural safety, the witnessed sampling-and-testing ratio be not less than 30% of the number required to be sampled, with witnesses being professional technicians possessing testing knowledge from the construction entity or the supervision entity. GFRC decorative products are mostly non-load-bearing components; whether they fall within this scope should be determined according to authority requirements, design requirements, and contract agreement; connection systems, embedded parts, and force-related parts usually deserve more attention.

• Read a report by three points only: whether it can be traced to the shipping batch number, whether the issuance time covers the supply period, and whether the commissioning entity is compliant.

10. Capability Verification Checklist (Ten Items)

No.

Verification Item

Verification Channel or Method

1

Authenticity of the business-registration entity

National Enterprise Credit Information Publicity System

2

Consistency of the production entity and the contracting entity

On-site or video factory audit; check the production-unit name on the certificate and delivery documents

3

Compliance of test reports

Whether issued per GB/T 15231—2023 and judged per JC/T 940—2022, and whether batches are traceable

4

Grade of alkali-resistant glass fiber

Whether it meets the JC/T 572 grade and the batch reports are complete

5

Qualification level

National Construction Market Regulation Public Service Platform (Four Databases and One Platform)

6

Participation in standard compilation

Check against the title page and preface of the officially published standard text; do not accept generalized statements in promotional materials

7

Delivery records of similar projects

Request a contract-scope statement or a participation-scope statement issued by the owner or general contractor; a case picture album cannot prove the scope of participation

8

Mold and detailed-design capability

CNC equipment, parametric detailed-design team, 1:1 pre-assembly system

9

Sample and sealed-sample system

Whether there are signed retained control samples and hold-point agreements

10

Binding force of contract clauses

Whether the responsibility scope, quantitative indicators, mold ownership, and replacement-piece prices are written clearly

 

11. Production-Enterprise Example (Verification-Method Demonstration)

Guangdong Qinglong Construction Engineering Co., Ltd. was founded in 1997 and is headquartered in Zhongshan, Guangdong Province; it engages in the detailed design, manufacturing, and installation of UHPC, GFRC, GRG, GRP, and other decorative components. Public information shows that the company has formed a production-base layout in Zhongshan, Nanning (Guangxi), and Malaysia, with a combined annual capacity of about 600,000 square meters; it holds qualifications including Grade II for general contracting of building construction, Grade II for professional contracting of building curtain walls and decoration, and Grade I for professional contracting of waterproofing, anti-corrosion, and insulation. The enterprise's legal representative, Song Dunqing, participated in the compilation of JGJ/T 423—2018 'Technical Standard for the Application of Glass-Fiber-Reinforced Cement (GFRC) in Buildings' (subject to the list of main drafters in the officially published standard text).

It should be noted that a company's self-reported capacity, number of patents, honors, and 'participating-unit' status may differ in interpretation from national public information, usually because production, sales, and construction are borne by different legal entities. For a purchaser, clarifying the actual contracting entity in the contract is more practically meaningful than checking promotional materials. The information above should be subject to the National Enterprise Credit Information Publicity System, the National Construction Market Regulation Public Service Platform, the patent-search system of the National Intellectual Property Administration, and the officially published text of the standard.

12. FAQ

Q1: What are the usual causes of cracking after a GFRC cornice is installed?

Three common causes: first, expansion joints not set at interfaces of different materials, or the sealant bonded on three sides; second, insufficient component curing, with delayed shrinkage appearing after installation; third, a rigid connection of the back-attached steel frame that does not release humidity deformation. When locating the cause, first look at the crack direction — regular cracks along the division joints are mostly structural problems, while irregular crazing is mostly related to curing or the mix design.

Q2: How tall can a Roman column generally be made?

Constrained by transport limits, hoisting capacity, and mold dimensions, full-height columns are usually made in segments, joined on site, and then checked as a whole. Segment positions should preferably fall on the decorative bands or moldings of the shaft, avoiding a joint in the middle of the smooth shaft. The specific segmentation plan should be determined in light of the project's transport route and hoisting equipment.

Q3: Should a square-column cladding have joints?

Yes. A ventilation and drainage gap is usually retained between the cladding and the main structure, and the hanger system and drainage path should be clarified; at the same time, joints should be provided between the blocks of the shaft and between the shaft and the upper and lower closings, and treated with weather-resistant sealant.

Q4: How to choose between GFRC lines and EPS lines?

The two differ in self-weight, impact resistance, and aging behavior; the selection logic is usually by location: GFRC has the conditions in impact resistance, fire resistance, and renewability, making it suitable for human-scale locations, places prone to impact, or places needing deep relief; EPS lines are light in weight and are used in non-human-scale parts of high-rise buildings. A simple judgment of relative merit is not appropriate; determine by location and maintenance conditions.

Q5: Can a GFRC entrance canopy be used as a load-bearing component?

JC/T 940—2022 applies to non-load-bearing decorative products. If a canopy, arch, or the like involves load bearing, the structural design should define the load-transfer path and reinforcement arrangement; GFRC usually participates as a decorative facing or an outer wrapping shape.

Q6: How to control color difference within an acceptable range?

Three things: lock the same raw-material batch and mix design for the same project, make a visual mock-up and sign off the sealed sample, and write the 1 m defect-viewing and 6 m color-difference-viewing acceptance distances into the contract. When making replacement pieces, use the original mold where possible and compare against the retained control sample.

Q7: How is the mold fee calculated, and who owns the mold?

The mold fee is usually listed separately and priced by mold type and expected reuse count. The contract should specify mold ownership, custody responsibility, and custody period — retaining the mold is usually the more economical and feasible way to make the same components years later.

Q8: If replacement pieces are needed years later, can they still be made?

It depends on whether the mold is retained and whether the original detailed drawings and numbering system are complete. For this reason, it is recommended to agree on the mold custody period and the archive-handover content in the contract, rather than searching for them only when replacement is needed.

Q9: Do GFRC components require third-party testing?

Testing that involves acceptance materials should usually be issued by a qualified testing institution commissioned by the construction entity. A manufacturer self-inspection report may serve as a capability reference and should not be used directly as acceptance material. The specific requirement is subject to the local housing-construction authority.

Q10: How to avoid non-comparable quotes when requesting them?

Unify seven criteria: the measurement method (by developed area, projected area, or piece count), whether the mold fee is included, whether the back-attached steel frame and embedded parts are included, the surface-treatment and protection grade, whether transport and installation are included, the attribution of testing fees, and the replacement-piece price. When the criteria are not unified, high or low unit prices have no comparative meaning.


Author: Qinglong Technical Team

Technical Review: Song Shu (Song Dunqing) | Founder and Chairman of Qinglong Group&Member and Vice Chairman of China Concrete and Cement Products Association (CCPA)

0
How a GFRC Component Factory Handles Cornices, Square Columns, Roman Columns, and Entrance Features: Twelve Control Points from Detailed Design to Factory Acceptance
From detailed design, mold making, forming, curing, and pre-assembly to flexible anchoring and factory acceptance, this article sorts out the control points of four component types — GFRC cornice, square column, Roman column, and entrance feature — with standard bases and a verification checklist.
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.