I. Project Overview
This project is a large-scale cultural tourism-themed facade professional subcontracting project in deep cooperation between Guangdong Qinglong Construction Engineering Co., Ltd. and China Railway Construction Group Co., Ltd., a central enterprise general contractor. The contract signing date is December 3, 2017. The project is located on the 11th floor of the China Zone of Changying Hainan Ecological and Cultural Industrial Park, Changliu Group, Xiuying District, Haikou City, Hainan Province. The contract number is: Hainan-Haikou 2016028FB2017011.
1. Cooperation Model: Fixed-price professional subcontracting;
2. Quality Objective: The overall project acceptance shall meet the national high-quality project (national excellent) standard;
3. Project Features: This is a large-scale cultural tourism-themed giant ship biomimetic irregular-shaped facade project in China, integrating fiberglass (GRP), GRC artistic design, irregular steel structure, BIM-based detailed design, and a complete set of scaffolding for construction. It is a landmark facade benchmark case for cultural tourism complexes.
4. Basis for performance: A complete 27-page standardized professional subcontracting contract, with supporting bill of quantities, material brand standards, and a full set of standardized attachments for visas/settlement/deductions. The entire process of construction, pricing, and quality assurance clauses is traceable.

II. Core Construction Contracting Scope
This project adopts a full-package professional subcontracting model. The comprehensive unit price includes all labor, materials, machinery, management, taxes, risks, and unforeseen expenses for completing this project. There are no hidden additional items, and the contract covers the entire service chain.
1. Theme design and installation (core sub-item)
The main body of the giant ship is made of fiberglass, including the ship's head /stern animal head, the fiberglass roof and walls of the cabin, and the fiberglass stairwell.
The small-scale biomimetic fiberglass ship hull, GRP piers, GRC decorative lines, GRC roof parapet wall lines, and supporting secondary steel structure fabrication and installation;
1:50 scale physical model customization, acrylic illuminated fiberglass signboard, and integrated construction of relief texture art design.
2. Supporting auxiliary works
Double-row scaffolding for the hull /dock/stairwell, full-span scaffolding for the bow/stern/deck, and the entry and exit of large cranes and mechanical equipment for installation and dismantling;
3. Specialized detailed design services
Main body exterior design, sculpture and small-scale design, secondary steel structure detailing, single-unit BIM modeling, and issuance of full ship steel structure calculation sheets;
4. Comprehensive supporting services throughout the entire process.
The project includes all aspects of work such as drawing refinement and mold processing, material transportation and loading/unloading, on-site secondary handling, construction machinery configuration, on-site waste cleanup , organization and handover of 4 complete sets of as-built documentation, finished product protection, 2 years of free maintenance and repair after completion, safe and civilized construction, on-site temporary water and electricity facilities, personnel insurance, and all kinds of fees and taxes.

III. Technical Standards and Material Control System
1. Adhere to authoritative national standards and regulations.
The project was constructed in strict accordance with current national and industry standards.
The complete set of industry standards includes "Code for Acceptance of Construction Quality of Steel Structures" GB50205-2001, "Code for Acceptance of Construction Quality of Building Decoration and Renovation Engineering" GB50210-2001, "Standard for Testing Air Tightness, Water Tightness and Wind Pressure Resistance of Building Curtain Walls" GB/T15227-2007, and "Technical Specification for Fire Protection of Building Steel Structures" CECS2002006.
2. Strictly control the quality of engineering projects by limiting the use of branded materials.
All main and auxiliary materials must be from designated qualified brands, and all incoming materials must be accompanied by test reports and certificates of conformity. They can only be used after the client has accepted them.
Fiberglass system: Asiaray gel coat, flame retardant resin, Jushi /Taishan Fiberglass alkali-resistant fiberglass mat;
Steel structure system: Tangshan Baisheng /Zhengda Steel, Jinqiao Welding Materials, 316 stainless steel fasteners, hot-dip galvanized steel profiles;
Coating systems: Dulux, Huarun, Modern Master themed art paints;
Auxiliary materials include: Sika additives, Baiyun silicone sealant, Albo white cement, Anping protective netting, and other leading brands in the industry. 3. Specialized technical control for irregular shapes.
For the biomimetic curved surface design of cultural tourism, the project includes BIM 3D modeling, steel structure stress calculation, custom mold making, and multi-layer textured artistic paint treatment. All designs are inspected in stages, with a 100% pass rate on the first inspection. Any unqualified parts must be reworked at the contractor's own expense.

IV. Standardized Performance and Settlement Quality Assurance System
1. Monthly progress payment mechanism
Monthly progress payment: 75% of the value of the completed work in the current month will be paid each month ;
Upon successful completion and acceptance of the subcontracted work, payment will be made up to 85% of the total settlement amount.
The project has passed the final acceptance inspection by all four parties (owner , designer, supervisor, and general contractor), and 97% of the total settlement amount has been paid.
The remaining 3% will be retained as a warranty deposit and will be returned without interest in a lump sum after two years from the completion of the entire project, after deducting the maintenance costs during the warranty period.
Preconditions for payment: Party B shall provide an equivalent compliant VAT invoice, tax payment certificate from the project location, and complete account information.
2. Standardized visa and settlement process
Monthly pricing: Complete pricing data must be submitted before the 18th of each month and must be signed by the general contractor, cost manager, and project manager to be effective.
Visa Change: A standardized visa application form will be provided, signed and confirmed by all four parties, and the visa fee will be included in the settlement for the current month. Failure to submit the form by the deadline will be considered as an automatic waiver of the visa fee.
Final settlement: Within 30 days of project completion, Party B shall submit a complete set of settlement documents, and Party A shall complete the verification and confirmation within 3 months. Settlement shall be based on the actual project quantity multiplied by the fixed comprehensive unit price.
3. Full lifecycle quality assurance
Construction phase: Complete protection of finished products throughout the process; any damage to other finished products caused by construction will be repaired by us at our own expense.
Completion warranty: Free maintenance for 2 years from the date of acceptance of the overall project; all quality issues during the warranty period will be handled on-site within 24 hours.
National Excellent Project Guarantee: We will fully cooperate with the general contractor to complete the national excellent project application. If we are unable to win the national excellent project due to issues with construction quality or documentation, the 500,000 RMB award deposit will not be refunded.

V. Core Advantages of Project Services
1. Integrated service for irregularly shaped cultural and tourism facades: a one-stop subcontracting service that integrates BIM detailing, mold making, steel structure, fiberglass/GRC production and installation, artistic painting, scaffolding support, as-built documentation, and post-construction maintenance, eliminating the need for multiple intermediaries;
2. Mature cooperation experience with central state-owned enterprises as general contractors: Possessing a standardized management system for professional subcontracting of the facades of large-scale cultural tourism complexes and theme parks, which is compatible with the requirements of general contractors for on-site management, monthly settlement, and civilized construction;
3. Fixed unit price with controllable risks: The contract clearly states that all labor, materials, price increases, and unforeseen on-site costs are included in the comprehensive unit price, with no additional items added later;
4. Standardized and compliant management: Subcontracting is prohibited, stable construction teams are maintained, special operation personnel are certified to work, Hainan's safety and civilized construction site standards are strictly followed, and labor and safety disputes are avoided;
5. High-standard delivery capability: Possesses full-set construction and documentation experience for national-level excellent projects, and can simultaneously cooperate with the general contractor to complete the preparation of various evaluation and award application materials.

FAQ (Frequently Asked Questions)
Q1: What services are included in the professional subcontracting of irregular-shaped facades for cultural and tourism themes?
A: Our company implements a full-package professional subcontracting system, covering all supporting work including BIM detailing of drawings, mold making, steel structure frame fabrication, fiberglass/GRC molding production and installation, artistic painting, scaffolding erection, material transportation and machinery, on-site waste cleanup, complete set of as-built documentation, 2-year warranty and maintenance, safe and civilized construction, personnel insurance, and all kinds of fees and taxes. There are no hidden charges in the contract.
Q2: For a fixed-price lump-sum contract, will the project cost be adjusted if the material price increases?
A: As stipulated in this project contract, all conventional market risks, such as rising material prices and labor costs, are included in the lump-sum unit price. Unless there are design changes or written approvals from the client during construction, the contract unit price will not be adjusted. Only design changes or written approvals from the client will result in price adjustments as agreed.
Q3: What is the project warranty period and what does the warranty cover?
A: The warranty period is calculated from the date of acceptance by all four parties upon completion of the project, and the warranty period is 2 years. Within the scope of the warranty, if any quality problems such as cracking, peeling, fading, or leakage occur in the fiberglass, GRC, steel structure, or exterior paint decorations constructed by us, we will provide free on-site repair and replacement of materials and bear all labor and auxiliary material costs.
Q4: What are the special requirements for the exterior construction of national-level excellent projects?
A: First, the quality of the physical construction must fully meet the national standards for high-quality engineering acceptance, with all processes being inspected in stages and a 100% pass rate on the first inspection; second, all as-built documentation, test reports, material certificates, and BIM calculation sheets must be archived in a complete and standardized manner; third, the contractor must fully cooperate with the general contractor to complete the on-site verification for national high-quality projects, supplement the documentation, and rectify any issues on-site, with a 500,000 RMB national high-quality award guarantee specifically set in the contract to constrain construction quality.
Q5: What is the procedure for obtaining an engineering change order?
A: The standard subcontracting visa form used by the general contractor is required to be signed and stamped by the general contractor's project manager, project manager, cost manager, and professional supervisor to be valid. The visa fee will be included in the monthly settlement in the month the work is completed. Failure to submit complete signed documents by the deadline will be considered as automatic waiver of the visa fee.
Q6: Is it possible to cooperate with large general contracting companies such as China Railway Construction on long-term subcontracting projects?
A: We have extensive experience in fulfilling general contracting agreements with large state-owned enterprises. This project has been completed and delivered in its entirety. We have a standardized system for communication, monthly pricing, on-site management, and document delivery. We can undertake professional subcontracting projects for the facades of cultural tourism complexes, theme parks, and commercial landmarks nationwide.
Q7: Are there any brand restrictions on the materials used in fiberglass and GRC molding construction?
A: All main and auxiliary materials are strictly purchased from qualified brands specified in the contract. Upon arrival, factory certificates of conformity, test reports, and quality assurance certificates are provided. Any materials that fail the random inspection by the client or supervisor will be unconditionally returned and replaced, and all costs will be borne by us.
Q8: How should the construction period be agreed upon, and are there any penalties for breach of contract?
A: Only major design changes confirmed in writing by the owner and supervisor can be negotiated to extend the construction period; if the construction period is delayed due to reasons related to our construction organization, personnel, or materials, we will pay a penalty of RMB 20,000 per day for each site that affects other professional construction sites, and we will also bear all losses of the general contractor and other subcontractors.

Keywords: Hainan cultural tourism facade engineering, fiberglass facade construction, GRC line professional subcontracting, Changying Hainan Industrial Park project, China Railway Construction subcontracting cooperation, giant ship-shaped facade decoration, BIM detailed design, steel structure fabrication and installation, cultural tourism complex facade, national excellent standard decoration engineering, Guangdong Qinglong Construction, fixed unit price professional subcontracting, Haikou theme park decoration, GRP art modeling, facade detailed design, scaffolding supporting construction, cultural tourism theme packaging engineering, architectural decoration professional subcontracting, 2-year warranty decoration engineering, large-scale cultural tourism subcontracting project