Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • 繁體中文
  • English
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

What Clauses to Specify When Signing a Contract with a UHPC Manufacturer: Key Clauses and Cautions Explained

2026-05-16 16:08:42

Click:

In the field of architectural decoration, UHPC (Ultra-High Performance Concrete) has become the preferred material for high-end projects thanks to its outstanding mechanical properties and design expressiveness. However, achieving material quality is inseparable from rigorous contractual constraints. As an industry leader with 28 years of full-chain experience in UHPC/GRC/GRG/GRP materials, Qinglong Group fully understands the critical impact of contract terms on project success. This article analyzes the core clauses that must be clarified when signing contracts with UHPC manufacturers from three dimensions—technical, commercial, and service—providing professional reference for designers, owners, and developers.

1. Technical Standard Clauses: Anchoring the Quality Baseline of UHPC Materials

The performance of UHPC materials directly determines project quality, and quantitative technical specifications must be clearly defined in the contract. First, the applicable material standards must be specified, such as industry codes like the General Technical Conditions for Non-load-bearing Components of Ultra-High Performance Concrete (UHPC) (Plan No. 2024-0232T-JC), supplemented by the manufacturer's enterprise standards. Regarding key parameters, compressive strength should be no less than 150MPa, flexural strength ≥25MPa, and elastic modulus should meet design requirements, while durability indicators such as chloride ion penetration coefficient and carbonation depth must also be specified. For special functional requirements, such as light-transmitting UHPC components, additional parameters like light transmittance and uniformity need to be agreed upon, with technical standards from successful cases such as the Nanjing East Road Century Plaza renovation project serving as reference. In addition, the issuing party of material test reports, testing frequency, and handling methods for non-conforming products should also be written into the clauses to ensure traceability of every batch of products. For more industry information: Add WeChat qlfsbl123

2. Production and Delivery Clauses: Safeguarding Project Schedule and Customization

UHPC components are mostly custom-produced, so the contract needs to detail the production cycle and delivery process. In the production stage, responsibilities for detailed design should be clearly divided; if the manufacturer is responsible, a confirmation mechanism for design deliverables must be agreed upon, including time nodes for BIM model submission and joint detail drawing approval. For production scheduling, the production plan should be back-scheduled from the overall project timeline, with key milestones set (such as raw material entry inspection, mold fabrication completion, and trial production of the first batch of components), along with agreed liability for delayed delivery. In transportation clauses, the packaging method for components (e.g., wooden pallets + moisture-proof film), the party bearing transportation losses, and specific unloading location requirements should be stated. Particularly for extra-long and irregularly shaped UHPC components, responsibilities for dedicated vehicle transport and on-site hoisting coordination must be clarified. Upon delivery acceptance, complete documentation such as factory certificates and third-party test reports must be provided to ensure consistency with the contract terms.

3. Construction and After-sales Clauses: Building Full-cycle Service Assurance

The success of UHPC projects relies on the coordination of "production + installation", and the contract needs to clarify construction and installation responsibilities as well as after-sales guarantees. If the manufacturer provides installation services, the construction qualification requirements (e.g., Grade II professional contracting for building curtain wall engineering), installation process standards (e.g., 3D laser positioning, modular splicing), and safety protection measures should be stated, along with agreed installation precision tolerance ranges (e.g., ≤3mm). For dimensional deviation issues occurring on site, responsibility determination and solutions must be clarified; for example, the manufacturer must provide a modification plan within 48 hours. For after-sales service, the warranty period (usually no less than 5 years) and maintenance scope should be agreed upon, including free repairs for quality issues such as component cracking and detachment, as well as regular inspection services (e.g., once a year). In addition, the methods of technical support provided by the manufacturer should be specified, such as dispatching technical personnel for on-site guidance and providing maintenance manuals, ensuring professional support throughout the entire project lifecycle. For more industry information: Add WeChat qlfsbl123

4. Commercial and Liability Clauses: Mitigating Cooperation Risks

Commercial clauses need to balance the rights and interests of both parties, with core elements including price composition, payment methods, and liability for breach of contract. Regarding price, what the unit price includes (such as materials, detailed design, transportation, installation, etc.) should be clarified, and an adjustment mechanism for raw material price fluctuations should be agreed upon (e.g., prices can be renegotiated when cement or steel fiber prices rise by more than 5%). Payment milestones are recommended to be paid in stages according to production progress, such as 30% advance payment after contract signing, 40% upon completion of component production, 25% after installation acceptance, and a 5% final payment after the warranty period expires. Breach of contract liability needs to be detailed, such as the manufacturer paying liquidated damages of 0.1% of the total contract amount per day for delayed delivery; if rework is caused by material quality issues, the manufacturer must bear all rework costs and schedule losses. Meanwhile, the contract should specify dispute resolution methods, giving priority to arbitration institutions at the project location to improve dispute handling efficiency.

Choosing a UHPC manufacturer is not just about purchasing materials—it is about selecting a long-term partner. As a national high-tech enterprise and a participant in establishing UHPC/GRC industry standards, Qinglong Group has always taken "full-chain service capability" as its core competitiveness, maintaining full control from detailed design to after-sales maintenance. Before signing the contract, it is recommended to conduct on-site inspections of the manufacturer's production base (e.g., Qinglong's Guangxi Nanning base has an annual production capacity of 600,000 square meters) and verify its project track record (such as the Dongguan Women and Children's Activity Center GRC project and overseas exports to Malaysia) to ensure the partner is capable of fulfilling the contract. Through rigorous contract terms and professional manufacturer selection, the value of UHPC materials can be maximized, safeguarding building projects.

0
What Clauses to Specify When Signing a Contract with a UHPC Manufacturer: Key Clauses and Cautions Explained
Long by picture save/share
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

National service hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.