In the field of architectural decoration materials, UHPC (Ultra-High Performance Concrete), with its outstanding mechanical properties and design expressiveness, is becoming the preferred material for landmark buildings and high-end projects. However, as a technology-intensive customized product, the rigor of UHPC contract terms directly determines project success or failure. Qinglong Group, with 28 years of full-chain experience in UHPC/GRC/GRG/GRP, has drawn on more than a thousand engineering projects to outline six core clauses that must be clarified when signing UHPC procurement contracts, helping partners avoid risks and safeguard their rights.
1. Material Performance Indicators: Rigid Constraints from Laboratory Data to Engineering Effectiveness
UHPC performance parameters are the cornerstone of the contract. Key indicators must be explicitly covered, including compressive strength (≥150MPa), flexural strength (≥20MPa), and elastic modulus, along with the specified testing standards (e.g., GB/T 31387). Qinglong Group recommends supplementing durability requirements such as chloride ion permeability coefficient and carbonation depth, while also stipulating the sampling process of third-party testing institutions (e.g., the National Building Materials Testing Center) to avoid replacing national standards with "enterprise standards." A commercial complex project once suffered losses exceeding one million due to unspecified early-age crack resistance, resulting in micro-cracks after installation—a lesson to be taken as a warning.
2. Customized Production Clauses: Full-Process Control from Design Drawings to Finished Product Delivery
As a UHPC manufacturer, Qinglong deeply understands the production complexity of irregularly shaped components. The contract must clarify the division of design development responsibilities—will the manufacturer complete BIM parametric modeling, or must the owner provide a 3D model? For special processes such as double-curved surfaces and hollow-out shapes, the mold development cycle (typically 20-30 days), trial production sample confirmation process, and cost-bearing arrangements should be stipulated. An opera house project once resulted in a 3cm deviation during on-site installation due to unspecified curved surface machining tolerances (recommended ≤2mm/m), which was ultimately resolved through Qinglong's "pre-assembly + laser scanning" technology.
3. Quality Acceptance Standards: Dual Safeguards of Visualized Nodes and Traceability Systems
Acceptance clauses should be detailed down to quantifiable indicators such as appearance quality (bubble diameter ≤3mm, color difference △E≤3), dimensional deviation (length ±5mm), and embedded part positions (±3mm). Qinglong Group innovatively adopts RFID chip implantation technology to achieve full traceability of each component's production time, quality inspector, and logistics information—this clause can serve as important evidence in quality disputes. At the same time, rework deadlines for non-conforming products (recommended within 7 working days) and liability for breach should be stipulated to avoid affecting the project schedule.
4. Installation and After-Sales Service: Full-Cycle Commitment from Technical Disclosure to Maintenance
UHPC installation requires matching professional construction teams. The contract should clarify whether the manufacturer provides installation guidance (such as Qinglong's "on-site technical supervision" service), lifting point design plans, and seismic construction requirements. For after-sales service, it is recommended to stipulate a warranty period of at least 5 years, covering structural safety, surface coating weather resistance, and other aspects. A municipal project experienced rusting after 3 years due to unspecified material requirements for installation auxiliary materials (such as stainless steel connectors)—such details must be listed separately in the contract.
5. Supply Chain Assurance: Rigid Constraints on Production Capacity, Logistics, and Emergency Mechanisms
When choosing a UHPC manufacturer like Qinglong with an annual production capacity of 600,000 ㎡, the contract still needs to stipulate monthly supply volume (e.g., ≥5000 ㎡), the production schedule confirmation process, and compensation standards for delayed delivery (recommended to be calculated at 0.05% of the contract amount per day). For force majeure events such as epidemics and raw material price increases, a clear risk-sharing mechanism should be established, such as stipulating a price adjustment formula when main material price fluctuations exceed 5%, to avoid cooperation disputes.
6. Intellectual Property and Confidentiality: Defining Ownership of Technological Innovation Achievements
For customized projects, the ownership of design development achievements and patented technologies must be clarified. Qinglong Group has participated in formulating industry standards such as the "General Technical Conditions for Non-Load-Bearing Components of Ultra-High Performance Concrete (UHPC)." It is recommended to note in the contract: intellectual property rights of new technologies and new processes developed based on the project belong to the manufacturer, while the owner enjoys exclusive project use rights—this both protects innovation enthusiasm and avoids legal risks.
As a National High-Tech Enterprise and UHPC standard-setting unit, Qinglong Group has always believed: a well-crafted contract is the starting point of win-win cooperation. From material performance to after-sales maintenance, from production cycles to intellectual property, the rigor of each clause reflects the manufacturer's professional strength. Only by choosing a UHPC manufacturer like Qinglong with full-chain capabilities in design development, production manufacturing, construction installation, and after-sales maintenance, combined with scientific contract terms, can the perfect presentation of a project from drawings to completion be ensured, rooting the mission of "creating beautiful architecture" firmly in place.