In the field of architectural decoration materials, the rigor of contract terms directly determines project success. As an industry leader with 28 years of experience in in-depth design and production of UHPC/GRC/GRG/GRP materials, Qinglong Group deeply understands the importance of clarifying key clauses when signing a contract. Drawing on whole-chain service practice, this article analyzes, for designers, owners, and procurement parties, the core points that must be locked in when signing a contract with a UHPC manufacturer, helping to avoid cooperation risks and maximize project value.
1. Material Performance Indicators: Rigid Constraints from Laboratory Data to Engineering Implementation
The mechanical properties and durability of UHPC materials are the foundation of the contract. Key indicators such as compressive strength (≥150MPa) and flexural strength (≥25MPa) must be clearly specified, along with long-term performance parameters such as elastic modulus and chloride ion permeability coefficient. Qinglong Group, as an enterprise that participated in formulating the industry standard "General Technical Conditions for Non-Load-Bearing Components of Ultra-High Performance Concrete (UHPC)", recommends stating in the contract that materials must comply with the latest national or industry standards, and requiring the manufacturer to provide type inspection reports issued by national-level testing institutions, ensuring material quality is controlled at the source.
2. Customized Production Clauses: Dual Guarantees for Shape Realization and Process Standards
UHPC is widely used for irregular components of landmark buildings thanks to its ultra-high plasticity, and customized production requirements must be detailed in the contract. Responsibility division for in-depth design should be clarified — for example, whether Qinglong's BIM parametric design services are included in the contract scope — together with mold manufacturing standards (e.g., CNC machining precision ≤0.5mm), surface treatment processes (e.g., how bush-hammered and mirror finishes are achieved), and color difference control range (ΔE≤3). For complex shapes such as double-curved surfaces and openwork reliefs, additional 3D scanning acceptance clauses are required to ensure design concepts are realized with precision.
3. Whole-Process Service Agreements: Closed-Loop Management from In-Depth Design to After-Sales Maintenance
A quality UHPC manufacturer should provide whole-chain services covering "design-production-construction-maintenance". The contract must specify the in-depth design cycle (e.g., optimization completed within 15 working days after drawings are received), production schedule milestones (e.g., monthly capacity of no less than 5000㎡), and installation technical requirements (e.g., 3D laser positioning installation with error ≤2mm). As a national high-tech enterprise, Qinglong recommends including after-sales maintenance clauses covering the free repair scope within the warranty period (typically 5-10 years) and emergency response time (e.g., on-site handling within 24 hours), building a full life-cycle guarantee system.
4. Quality Traceability and Acceptance Standards: Building a Traceable Responsibility System
To eliminate engineering hazards, the contract must establish a quality traceability mechanism. The manufacturer is required to attach a unique identifier (such as an RFID chip) to each batch of products, recording raw material batches, production time, testing data, and other information. The acceptance phase should specify staged standards: sampling tests for bending resistance, impermeability, and more before leaving the factory; verification of appearance and dimensions upon arrival (allowable deviation ±3mm); and a structural safety review after installation. The "Technical Standard for Building Application of Glass Fibre Reinforced Cement (GRC)", formulated with Qinglong's participation, can serve as a reference basis for acceptance, ensuring controllable processes and traceable responsibilities.
5. Risk and Responsibility Division: Clarifying Boundaries and Emergency Plans
The contract must clearly divide responsibilities between both parties: rework costs caused by substandard material performance shall be borne by the manufacturer, while the sharing method for additional costs arising from design changes must be clearly defined. For common risks such as transportation losses (it is recommended to stipulate a loss rate ≤0.5%) and construction delays, emergency plans should be established; for example, Qinglong's production bases across the country can provide nearby replacement part services, ensuring project progress is not affected. In addition, intellectual property ownership must be specified to avoid infringement disputes arising from customized design schemes.
As a professional manufacturer in the field of UHPC/GRC/GRG/GRP materials, Qinglong Group has always been guided by the values of "honesty, perseverance, trust, and collaboration", building a foundation of trust with clients through standardized contract terms. Choosing a manufacturer with whole-chain service capabilities that participates in standard formulation is not only a guarantee of project quality, but also a long-term commitment to architectural aesthetics and engineering safety. In the wave of new architectural decoration material applications, rigorous contract terms will become the first line of defense for project success.