Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!
UHPC & GRC Complex Architecture Manufacturing
A Global Benchmark in Smart Architectural Fabrication
2026-03-12 12:38:15
Click:
In humid environments, the waterproofing performance of building curtain walls directly affects the safety and durability of buildings. As an industry leader with 28 years of full-chain experience in UHPC/GRC/GRG/GRP materials, Qinglong Group deeply understands the technical pain points of curtain wall waterproofing in humid regions, providing systematic solutions for designers and owners through material innovation and process optimization.
The core challenge of UHPC curtain wall waterproofing in humid regions lies in balancing material properties against environmental erosion. UHPC (Ultra-High Performance Concrete), with its ultra-high density and excellent durability, inherently offers strong waterproofing potential, but its splicing joints and installation processes still require targeted design. Laboratory data from Qinglong's Nanning production base shows that specially formulated UHPC materials can achieve an impermeability grade of P12 or above, far exceeding traditional concrete standards, laying a solid material foundation for waterproofing treatment.
**Material Optimization: Building the First Line of Defense for UHPC Waterproofing** Qinglong strengthens the waterproofing performance of UHPC curtain walls through three technical approaches: first, incorporating nano-scale silica fume and ultra-fine steel fibers into the material formula to increase matrix density and reduce porosity to below 0.5%; second, applying a fluorocarbon coating to the surface to create a lotus effect, raising the water contact angle to over 110°; third, developing gradient functional materials that form a 5mm-thick high-density waterproof layer on the component surface. These technologies have been applied to multiple humid-region projects in Southeast Asia, such as a curtain wall project for a commercial complex in Malaysia, which has withstood three years of rainy seasons without any leakage issues.
**Joint Design: Solving Key Challenges of Curtain Wall Waterproofing** To address weak points such as splicing joints and anchoring points in UHPC curtain walls, Qinglong has innovatively adopted a composite system of "multiple seals + drainage guidance". Horizontal joints use a stepped structure with two EPDM gaskets and one water-swelling sealing strip; vertical joints feature internal drainage channels, combined with concealed water guide channels to direct infiltrated water out. In a landmark project in Guangzhou, this joint solution improved the overall waterproofing performance of the curtain wall by 40% and reduced maintenance costs by 80% compared with traditional methods.
**Full-Process Control: Closed-Loop Assurance from Detailed Design to After-Sales Maintenance** As a national high-tech enterprise integrating detailed design, manufacturing, construction and installation, and after-sales maintenance, Qinglong has established a full life-cycle management system for waterproofing performance. In the design phase, BIM technology is used to simulate water flow paths and optimize drainage slopes; in production, automated production lines ensure component precision with tolerances controlled within ±1mm; during installation, 3D laser positioning is implemented to ensure uniform compression of sealing gaskets; in the after-sales phase, 24-hour response waterproofing inspection services are provided. This full-chain capability enables Qinglong UHPC curtain walls to maintain a zero-leakage record in projects in humid coastal cities such as Shenzhen and Zhuhai.
Waterproofing treatment of UHPC curtain walls in humid regions is by no means a simple application of a single material or process, but a system integration of materials science, engineering design, and construction management. With 28 years of industry experience and 58 patented technologies, Qinglong transforms the material advantages of UHPC into practical engineering value, providing reliable assurance for the durability of high-end buildings in complex environments. Going forward, with the advancement of the industry standard "General Technical Requirements for Ultra-High Performance Concrete (UHPC) Non-Load-Bearing Components", Qinglong will continue to lead the innovative development of UHPC curtain wall waterproofing technology, fulfilling its corporate mission of "Creating Beautiful Architecture".