The delivery time of GRC projects is affected by multiple variables such as design complexity, order scale, and seasonal factors; the overall cycle for conventional projects typically ranges from 30 to 60 days. Qinglong Group has established a management system of "order grading + dynamic scheduling + concurrent engineering," compressing the delivery time of standard flat-panel products to 25 days and keeping complex double-curved components within 45 days. Scientific production planning must be based on accurate capacity assessment and project-specific analysis, rather than a simple one-size-fits-all standard.
Key factors affecting delivery time include product type and process requirements. Conventional products such as standard mouldings and flat panels have relatively short delivery times due to short mould preparation and mature production processes; special products such as irregular double-curved panels and translucent GRC, however, require multiple processes including digital modeling, CNC mould machining, and test piece fabrication, which naturally extends the production cycle. In the Wuhan Hanxiu Theater project, Qinglong Group controlled the production cycle of 9,000 square meters of double-curved panels to 60 days through concurrent engineering management, 20% shorter than the industry average.
The scientific approach to capacity planning and order scheduling directly determines the on-time delivery rate. We use a MES system for real-time capacity monitoring, rationally allocating monthly capacity into conventional product lines (60%), rush order channels (20%), and technology R&D reserves (20%). For strategic client projects, a green channel is opened, with production line optimization ensuring priority delivery. Meanwhile, a raw material safety stock mechanism has been established to prevent supply chain fluctuations from affecting production schedules. This flexible production system has raised the on-time order delivery rate to 98.5%.
Seasonal factors also need to be fully considered. The periods around the Spring Festival and the rainy season each year are peak production seasons for the industry, and delivery times may be extended accordingly. Qinglong Group recommends that clients communicate in advance during the project planning stage and stagger production scheduling to ensure optimal delivery timeliness. A transparent progress notification mechanism has been established, providing clients with weekly production progress reports so they can track project updates in real time. This proactive service has effectively enhanced the cooperation experience.