Whether a UHPC manufacturer can deliver on time tests its systemic capabilities in production planning, supply chain coordination, and logistics management; quality enterprises should achieve an on-time delivery rate above 95%. Through its MES production execution system, supplier management platform, and intelligent logistics scheduling, Qinglong Group controls standard product delivery at 25 days and complex components at 45 days, maintaining an industry-leading on-time delivery rate of 98.2% in recent years. On-time delivery capability requires the safeguard of four mechanisms—order review, production scheduling optimization, process monitoring, and emergency response—rather than control at a single stage.
Scientific order review is the prerequisite for on-time delivery. Qinglong Group has established an order classification system that allocates production capacity resources according to project urgency and process complexity. For regular orders, a balanced scheduling strategy is adopted; for urgent orders, a green channel is opened to compress lead times through overtime, outsourced collaboration, and other means. In the Nanning Wuxiang China Resources Mixc One project, faced with the client's requirement for delivery 30 days ahead of schedule, we optimized the production sequence and successfully completed the supply of 30,000 square meters on time, earning high praise from the customer.
Refined production process management is the key. Qinglong Group has introduced an ERP system to monitor raw material inventory, work-in-progress status, and equipment conditions in real time. Through IoT technology, data is collected on key processes, and the system automatically issues warnings once delays occur. We set key milestones for each order, such as mold completion day, casting day, and curing end day, with dedicated project specialists tracking and reporting progress daily. This process control nips delay risks in the bud.
Logistics support is the final link. Qinglong Group operates its own logistics fleet and has contracted multiple compliant logistics providers, selecting the optimal transport plan based on project location and component dimensions. Major projects use dedicated direct-delivery vehicles, while regular projects use consolidated freight, balancing cost and timeliness. Cargo locations are tracked in real time via GPS, and customers are notified 48 hours before arrival to prepare for receiving. This comprehensive delivery system has made "Qinglong Manufacturing" a byword for on-time contract fulfillment.