What Are the Steps of GRC Installation? A Detailed Guide to Qinglong's Standardized GRC Installation Process

2025-12-20 13:51:28

Click:

GRC installation must follow a standardized process, generally divided into six stages: preparation work, measurement and layout, substrate treatment, panel installation, joint treatment, and cleaning and acceptance. Each stage has strict technical requirements.

In the Shanghai Century Plaza renovation project, the Qinglong installation team strictly executed the standardized process: first, a site survey was conducted using a 3D scanner to obtain substrate data; then a BIM model was used for installation simulation to optimize the installation sequence; during installation, the sequence proceeded from bottom to top and from the center outward to both sides, completing a fixed area each day; joint treatment used a dedicated sealant applied in two passes; finally, comprehensive inspection and acceptance were carried out. This standardized operation ensured the project was completed to a high quality.

Pre-Installation Preparation Stage

Verify drawings against on-site dimensions; adjust if errors exceed tolerance. Check panel numbering, quantity, and quality; replace damaged panels. Prepare construction tools and check safety devices. Conduct technical briefings to clarify key points.

Measurement and Layout

Set installation reference lines with an accuracy of ±1mm. Mark panel grid lines clearly and accurately. Recheck substrate dimensions and record deviation data. Layout must be rechecked and confirmed after completion.

Substrate Treatment Requirements

Substrate strength must meet standards, with no hollowing or cracking. Flatness deviation ≤4mm/2m. Waterproofing layer intact, with no leakage. Embedded parts accurately positioned, secure and reliable.

Panel Installation Technique

Install panels in numbered sequence to prevent misplacement. Secure hangers firmly and adjust into place. Keep panel joints even and uniform in width. Inspect and correct promptly to ensure quality.

Strict adherence to standard procedures is the guarantee of installation quality. Qinglong GRC's standardized installation system ensures every project is perfectly presented.

0
What Are the Steps of GRC Installation? A Detailed Guide to Qinglong's Standardized GRC Installation Process
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Business Hotline: +86 760 8870 6348      Mobile: +86 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
+86 139 0259 7531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.