How to Fix GRC After Installation? In-Depth Analysis of Fixing Technology from Qinglong GRC Manufacturer

2025-12-09 17:28:40

Click:

The fixing method of GRC products directly affects installation safety and service life. Based on 28 years of engineering practice, Qinglong GRC manufacturer has developed a comprehensive fixing technology system to ensure GRC components are safe and reliable.

In the Shenzhen Yirui Biotechnology Building project, Qinglong adopted a back-anchor dry-hanging system to fix GRC curtain wall panels. Each panel is connected to the steel frame through 4 stainless steel back anchors, forming a stable four-point support. The back anchors are embedded to a depth of 2/3 of the panel thickness, ensuring reliable anchorage. The project also incorporates anti-fall devices, so even if a single anchor point fails, the panel will not fall. This multiple-insurance fixing method gives the curtain wall system a safety factor of over 3.0, far exceeding code requirements.

Fixing Point Design Principles

Determine the number of fixing points based on panel dimensions, generally no fewer than 4 points per square meter. Add fixing points at critical locations to increase safety reserves. Fixing points should be evenly distributed to avoid stress concentration. Scientific fixing point design is the foundation of safety.

Anchor Depth Technical Requirements

Expansion bolt anchoring depth shall be no less than 5d, and chemical anchor depth no less than 8d. Pull-out tests should be conducted at critical locations to ensure anchoring force meets standards. Regularly inspect anchoring conditions and promptly identify and address problems. Anchor depth must be strictly implemented according to specifications.

Anti-Loosening and Anti-Falling Measures

Use anti-loosening devices such as lock nuts and spring washers. Install anti-fall steel wire ropes to provide secondary protection. Regularly check fastening conditions and perform timely maintenance. Multiple anti-loosening measures ensure long-term safety in use.

Deformation Accommodation Design

The fixing system should accommodate structural deformation by incorporating sliding supports. Use elastic shims to absorb vibration energy. Install adjustable devices at critical locations for convenient later adjustment. Scientific deformation design can extend service life.

A reliable fixing system is the guarantee of safety. Qinglong GRC manufacturer ensures every project is safe and reliable through scientific fixing design and strict construction control.

0
How to Fix GRC After Installation? In-Depth Analysis of Fixing Technology from Qinglong GRC Manufacturer
Long by picture save/share
文章推荐
Image display

Home     |    Products     |    Portfolio     |    News     |    Join Us     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

Customer Service Hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email : qlfsgrc@163.com

 

 Scan  WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.