Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

Can GRC Manufacturers Guarantee Delivery Times? An Analysis of Qinglong GRC Manufacturer's Contract Performance Assurance System

2025-12-06 18:04:52

Click:

Delivery guarantee reflects a GRC manufacturer's project management capability. Through 28 years of accumulated experience, Qinglong has established a scientific contract performance assurance system, maintaining an on-time delivery rate above 98% for five consecutive years.

In the Wuhan Han Show Theater project, faced with the complex production task of red curved GRC panels, Qinglong used the MES system for precise production scheduling, breaking the production process down into 285 control nodes. When raw material supply was delayed due to the pandemic, the emergency mechanism was activated immediately, and uninterrupted production was ensured through safety stock and supplier coordination. The project was ultimately delivered 5 days ahead of schedule, and this performance capability won high praise from the owner. The "early warning-response" mechanism adopted in the project has now become part of Qinglong's standard management process.

Production Planning Management

An ERP system is used for full-process planning management, establishing an integrated control system covering "order-procurement-production-shipping". Emergency order demands are met through safety stock settings and capacity reservation.

Supply Chain Coordination Assurance

A collaborative platform has been established with 86 core suppliers to achieve on-time material delivery. Through a supplier assessment mechanism, the on-time raw material supply rate is ensured at 99%.

Quality Control System

58 quality control points ensure first-pass yield. The full inspection system avoids rework delays; this quality stability is the foundation of delivery guarantee.

Delivery guarantee requires systematic support. It is recommended to focus on examining the manufacturer's production management system and emergency handling capability.

0
Can GRC Manufacturers Guarantee Delivery Times? An Analysis of Qinglong GRC Manufacturer's Contract Performance Assurance System
Long by picture save/share
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

National service hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.