Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

What Should Be Noted in UHPC Construction? Key Technical Points of Ultra-High Performance Concrete Explained

2025-12-05 14:33:42

Click:

Quality control during the UHPC construction process requires attention to multiple key technical stages, from material storage to the completion of curing; every step directly affects the final result. Based on extensive engineering experience, we have summarized the following construction points that require special attention, helping project teams avoid common problems and ensure construction quality.

Material storage and management is an important part of construction preparation. UHPC is usually supplied in dry-mix form and must be strictly protected from moisture during storage; it is recommended to store it in a dry, ventilated indoor environment. Materials from different batches should be clearly labeled to ensure first-in, first-out use. Materials supplied by Qinglong Group come with detailed usage instructions and batch information, which should be carefully read and followed before construction. On-site storage conditions directly affect material performance and must be given sufficient attention.

Mix proportion control requires precision down to every detail. Water content must be weighed strictly according to the design mix ratio, as even minor deviations can significantly affect workability and strength. It is recommended to use calibrated electronic scales for weighing to avoid human error. Mixing time and sequence must be strictly followed to ensure uniform fiber distribution. The dry-mix supplied by Qinglong Group comes with an optimized mix ratio—just add water and mix according to the instructions, which greatly simplifies on-site operations.

Formwork requires special attention. UHPC has excellent flowability and places extremely high demands on formwork sealing—any gap may lead to paste leakage. The surface quality of the formwork directly affects the appearance of the elements, so an appropriate release agent should be selected and the surface kept clean and smooth. Formwork for complex elements requires dedicated design, taking into account the pouring sequence and air venting measures. Qinglong Group's technical support team can provide formwork design consultation for projects to ensure molding quality.

The pouring process needs to be carefully organized. Determine a reasonable pouring sequence based on the shape of the elements to avoid cold joints and defects. Vibration should be moderate—the ideal result is a surface showing paste with no obvious air bubbles. Pouring of large elements should be carried out in layers, with the interval time between layers under control. Qinglong Group recommends conducting process trials before construction to optimize all parameters and ensure smooth formal construction.

Curing is key to ensuring UHPC performance. After initial setting, timely covering for moisture retention is needed to prevent plastic shrinkage cracks. Appropriate thermal and moisture retention measures should be taken according to environmental conditions, and steam curing is recommended where conditions permit. Curing time must be sufficient to ensure full strength development. The curing guidance provided by Qinglong Group is based on extensive experimental data and offers specific recommendations for different climatic conditions.

Construction records and testing are equally important. Record construction parameters in detail to provide a basis for quality traceability. Prepare test specimens as required to verify strength development. Identify and address anomalies promptly to keep project quality under control. Complete construction documentation is an important part of quality management and a valuable resource for subsequent maintenance.

0
What Should Be Noted in UHPC Construction? Key Technical Points of Ultra-High Performance Concrete Explained
Long by picture save/share
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

National service hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.