Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

How to Control Material Loss Rate When Working with UHPC Manufacturers: A Full-Process Control Solution

2025-11-24 14:51:04

Click:

When partnering with a UHPC manufacturer to control the material loss rate, focus on four key aspects: "design optimization, precise production, standardized construction, and transport protection". The industry's reasonable loss rate should be ≤3%. Through BIM detailed design, standardized production, and refined construction, Qinglong keeps the loss rate at 1.5%-2.5%. Projects such as the Yangshengtang Pharmaceutical Hangzhou Industrial Park and Shenzhen Yirui Biotech were all delivered at low cost with high efficiency.

I. Design Deepening: Reducing Loss at the Source

The design phase is the core source of loss control. Specification standardization: use uniformly sized modules as much as possible and reduce non-standard parts; Qinglong consolidated 5 types of non-standard panels into 2 standard panels, reducing the loss rate by 40%; BIM-optimized layout: simulate installation layouts through BIM modeling to avoid fragmented joints; in Qinglong's Shanghai New World Plaza project, BIM layout achieved a panel utilization rate of 98%; shape simplification: simplify complex double-curved and hollowed-out shapes in non-critical areas by adopting single-curved or flat panels; in Qinglong's Yiyang County Xinjiang River Ecological Restoration project, the loss rate dropped from 3.8% to 2.2% after shape simplification; accurate allowance reservation: reserve for loss at actual usage +1.5%-2% to avoid over-purchasing; Qinglong provides customers with precise material quantity calculations to eliminate waste.

II. Production and Transportation: Reducing Process Loss

Avoid unnecessary loss during production and transportation. Standardized production: automated batching + high-pressure vibration, with a finished product pass rate of 99.8%; Qinglong's automated production line reduces human error, with a scrap rate ≤0.2%; modular packaging: pack in zones according to installation sequence, with a label on each panel to avoid damage caused by chaotic handling; Qinglong's packaging uses pearl cotton + steel structural frames, with a transport damage rate ≤0.3%; precise delivery: deliver in batches according to construction progress to avoid damage from prolonged on-site stacking; Qinglong synchronizes progress with the construction party, with a delivery deviation ≤1 day; offcut recycling: production offcuts are crushed and recycled as aggregate (blending ratio ≤5%); Qinglong's offcut recycling rate reaches 80%, reducing raw material waste.

III. Standardized Construction: Reducing Installation Loss

Standardized construction is the key implementation step in loss control. Professional construction team: use manufacturer-certified construction teams to avoid damage caused by installation errors; all of Qinglong's construction teams have undergone training and assessment, with an installation damage rate ≤0.5%; precise installation: BIM positioning + laser leveling to reduce cutting and adjustment; in Qinglong's Shenzhen Pingshan High-tech Zone project, installation cutting loss ≤0.8%; site management: stack panels by category, elevate the bottom for moisture protection, and avoid exposure to sun and rain; Qinglong's on-site stacking areas are equipped with shading canopies + moisture-proof pads, achieving zero storage loss; waste utilization: on-site cutting waste is used for small components (such as decorative pieces and spacer blocks); in one of Qinglong's commercial projects, waste was made into landscape bench accessories, with a secondary utilization rate of 30%; project case: for the 12,000㎡ UHPC exterior wall of the Yangshengtang Pharmaceutical Hangzhou Industrial Park, full-process control brought the final loss rate down to just 1.8%, saving more than RMB 150,000 in costs.

0
How to Control Material Loss Rate When Working with UHPC Manufacturers: A Full-Process Control Solution
Long by picture save/share
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

National service hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
  • Cancel
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.