The delivery cycle for custom UHPC panels is typically 15-45 days, depending primarily on project complexity, order volume, and mold fabrication time. Simple flat panel orders can be delivered in as little as 15 days, while complex shaped components may take up to 45 days. With an annual capacity of 600,000 square meters and automated production lines, Qinglong has compressed the delivery cycle for standard orders by 20%, achieving efficient delivery for projects such as the Shenzhen Yirui Biotechnology Building.
I. Standard Delivery Cycle Breakdown: Adapted by Project Type
Different project types correspond to different delivery timeframes. Standard flat panel orders: no complex shapes (such as flat or simple L-shaped designs) with order volume ≥100㎡, delivery cycle of 15-20 days including production, curing, and inspection; such orders account for 40% of Qinglong's business, with a 98% on-time delivery rate. Complex shaped orders: customized designs such as double-curved surfaces, hollow-out patterns, and faux stone textures require additional time for mold fabrication (10-15 days), with a delivery cycle of 30-40 days. For Qinglong's faux wood translucent panel project at Shanghai New World Plaza, delivery was completed in 35 days including mold fabrication. Extra-large/multi-category orders: order volume ≥5000㎡ or containing multiple customization types requires coordinated production scheduling, with a delivery cycle of 40-45 days. For Qinglong's 12,000㎡ order for the Yangshengtang Pharmaceutical Hangzhou Industrial Park, delivery was completed in 42 days.
II. Key Factors Affecting the Delivery Cycle
Three major factors directly determine delivery speed. Mold fabrication: newly developed molds (especially double-curved and irregular shapes) require 3D design and CNC machining, taking 10-15 days; reusing existing molds can save time in this step. Qinglong's mold library stocks over 1,000 sets, so common shapes do not require new mold fabrication. Production scheduling: during peak seasons (March-June and September-December), orders concentrate and scheduling requires 7-10 days of advance booking; Qinglong's automated production lines enable parallel production of multiple orders with flexible scheduling. Transportation distance: shipping to major domestic cities takes 2-5 days, while remote areas or overseas orders require additional transportation time (15-20 days for overseas); Qinglong partners with multiple logistics companies, improving transportation efficiency by 30%.
III. Qinglong's Delivery Advantages and Project Practice
Full-process optimization ensures efficient delivery. Capacity assurance: an annual capacity of 600,000 square meters with automated production lines running 24 hours, each line producing ≥500㎡ per day. For Qinglong's 3,000㎡ order for the Shenzhen Yirui Biotechnology project, production and delivery were completed in 20 days. Technology empowerment: BIM detailed design plus parametric modeling shortens the mold design cycle by 30%. For Qinglong's public art project at the Shanghai Astronomy Museum, the complex mold design took only 8 days. Flexible scheduling: a green channel is opened for urgent projects, coordinating capacity for priority production. Qinglong once completed a 1,000㎡ order for a municipal project in 15 days. Project case: an order for 50mm-thick UHPC hollow-out panels for the Ouargla Hotel in Algeria, including mold fabrication, production, and overseas shipping, was delivered on time in 45 days, earning high recognition from the client.