Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!

Site Map   |  Contact Qinglong   | 

English
  • 中文
  • English
Qinglong UHPC & GRC

UHPC & GRC Complex Architecture Manufacturing

A Global Benchmark in Smart Architectural Fabrication

400-777-2203
0760-88706348
13902597531
Image display
资讯中心

How many days is the minimum curing period for GRC components?

2025-11-22 15:25:21

Click:

GRC components require a curing period of at least 7 days, with a standard curing period of 7-14 days. High-temperature, high-humidity environments can shorten it to 7 days, while low-temperature, dry environments require extension to 14-21 days. The core is to ensure full GRC hydration and adequate strength. Through constant temperature and humidity curing, Qinglong ensures that components reach over 80% of design strength in 7 days, meeting installation requirements.

1. Core Requirements and Standards for the Curing Period

The curing period must meet the requirements for strength development and shrinkage stability. Strength requirements: after 7 days of curing, GRC compressive strength ≥15MPa and flexural strength ≥8MPa, meeting installation load-bearing requirements; Qinglong's components reach over 85% of design strength after 7 days of curing. Shrinkage requirements: during the curing period, the drying shrinkage rate must be controlled at ≤0.03% to avoid drying shrinkage cracks; after curing, Qinglong's components have a drying shrinkage rate ≤0.025% with no visible cracks. Curing environment: normal temperature environments (20±5℃) require humidity ≥90%, while low-temperature environments (<10℃) require insulation and moisture retention; Qinglong's constant temperature and humidity curing rooms maintain 20-25℃ and humidity ≥95%, achieving better curing results.

2. Curing Periods and Methods in Different Environments

Different environments require adjustments to the curing period and process. Normal temperature environments (10-30℃): curing period of 7-10 days, using geotextile covering + water spraying (3-4 times daily) to keep surfaces moist; Qinglong's components cured at normal temperature reach 95% of design strength in 10 days. High-temperature, high-humidity environments (>30℃, humidity >75%): curing period of 7 days, using moisture-retention film covering to prevent rapid water evaporation; Qinglong checks humidity daily during high-temperature curing to prevent surface drying. Low-temperature environments (<10℃): curing period of 14-21 days, using steam curing or insulated curing (covering with thermal blankets + heating equipment) at temperatures ≥10℃; Qinglong's low-temperature steam curing for 14 days achieves a 100% strength compliance rate. Dry environments (humidity <45%): curing period of 10-14 days, using mist spraying + moisture-retention film covering to extend moisture retention; Qinglong's components cured in dry environments have no drying shrinkage cracks.

3. Qinglong's Curing Process and Quality Control

Standardized curing processes ensure component quality. Curing process: components are immediately covered with moisture-retention materials (geotextile, moisture-retention film) after demolding, with curing starting within 24 hours; during curing, avoid impact, direct sun exposure, and rain; Qinglong initiates the curing process within 12 hours after demolding. Quality testing: strength is sampled and tested on days 7 and 14 of the curing period; if requirements are not met, the curing period is extended; Qinglong's strength testing coverage reaches 100%, and substandard components are prohibited from leaving the factory. Project case: GRC components for the Zhuhai Chimelong GRG ceiling project were cured at constant temperature and humidity for 7 days, reaching design strength; after installation, there has been no deformation or cracking, and performance has remained stable over years of use.

0
How many days is the minimum curing period for GRC components?
Long by picture save/share
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

National service hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.