Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!
UHPC & GRC Complex Architecture Manufacturing
A Global Benchmark in Smart Architectural Fabrication
2025-11-25 15:47:32
Click:
The output of leading GRC manufacturers can fully meet the demands of various projects, while small and medium-sized manufacturers may be constrained by capacity and unable to take on large projects. Qinglong has an annual production capacity of 600,000 square meters and multi-line scheduling capability, meeting output demands ranging from small and medium-sized projects to large landmark projects.
I. Output Evaluation Indicators: Quantifying Capacity
Three key indicators judge output capability. Annual capacity: Qinglong's 600,000 ㎡ can support simultaneous production for multiple large projects—the 120,000 ㎡ roofing project of the Hainan International Convention and Exhibition Center occupied only part of its capacity. Monthly capacity: regular monthly capacity is 50,000 ㎡, peaking at 80,000 ㎡, with temporary expansion possible for urgent projects. Number of production lines: multiple parallel lines can produce different product types separately—flat-panel, double-curved, and irregular-shaped products do not conflict. Qinglong concurrently handled the Shenzhen Yirui Biotech flat-panel project and the Guangxi New Media Center double-curved project without mutual interference.
II. Capacity Adaptation for Different Project Requirements
On-demand matching ensures supply. Small and medium-sized projects (<3,000 ㎡): sufficient capacity with a delivery period of 15–30 days; Qinglong responds quickly, delivering the Guangzhou Zengcheng Qiangwei Garden project on time. Large projects (10,000–100,000 ㎡): well-planned production schedules with phased delivery; the 30,000 ㎡ Shenzhen Pingshan High-tech Zone Comprehensive Service Center project was delivered in 3 batches without affecting on-site construction. Extra-large projects (>100,000 ㎡): full capacity mobilization with supply chain coordination; for the 120,000 ㎡ Hainan International Convention and Exhibition Center project, Qinglong committed 60% of its capacity and completed delivery on time.
III. Qinglong's Capacity Assurance and Contingency Plans
Multiple dimensions ensure sufficient output. Supply chain assurance: long-term agreements signed with raw material suppliers; raw material inventory supports 30 days of production with no risk of supply interruption. Production line scheduling: multiple lines can flexibly switch product types; for urgent orders, non-urgent projects can be paused with priority given. Outsourcing partnerships: cooperative relationships established with quality subcontractor manufacturers allow orders exceeding capacity to be diverted, ensuring delivery. When choosing a GRC manufacturer, be sure to confirm whether its capacity matches project requirements. Qinglong's 600,000 ㎡ annual capacity plus flexible scheduling capability can meet the output demands of all types of projects—projects such as Kunshan Dongfang Shunjing and Changsha Shuiyunjian Villa have all verified this advantage.