What Is the Typical Production Cycle for Custom GRC Decorative Panels?

2025-11-22 17:20:18

Click:

The production cycle for customized GRC decorative panels typically takes 20-45 days, mainly depending on mold making, order complexity, and production scheduling. Simple custom shapes (such as conventional single-curved and flat panels) are delivered in 20-25 days, while complex shapes (such as double-curved, hollowed-out, and relief designs) take 30-45 days. With an annual capacity of 600,000 square meters and standardized processes, Qinglong has shortened the cycle of regular custom orders by 15%, and projects such as the Guangxi New Media Center and the Dongguan Women and Children's Activity Center have been delivered efficiently.

I. Regular Custom Cycle: Divided by Shape Complexity

Different levels of complexity correspond to different production lead times. Simple custom shapes: flat panels, simple single curves, and conventional moldings—mold making takes 5-8 days, production plus curing takes 15-17 days, with a total cycle of 20-25 days; Qinglong's GRC window casing molding order for Zhongshan Kaiyin New Town was delivered in 22 days. Medium-complexity shapes: simple hollowed-out patterns, shallow relief, and combined shapes—mold making takes 8-12 days, production plus curing takes 20-23 days, with a total cycle of 28-35 days; Qinglong's GRC hollowed-out panel project for Sanya Yingbin No. 1 was delivered in 30 days. High-complexity shapes: double curves, deep relief, and special-shaped combinations—mold making takes 12-18 days, production plus curing takes 23-27 days, with a total cycle of 35-45 days; Qinglong's double-curved GRC panels for the Guangxi New Media Center were delivered in 42 days.

II. Key Factors Affecting the Production Cycle

Three key factors directly determine delivery speed. Mold making: newly developed molds (especially for double curves and deep relief) require 3D design and CNC machining, taking 5-18 days; reusing existing molds can skip this step. Qinglong's mold library holds over 1,000 sets, so common shapes require no new molds. Production scheduling: during peak seasons (March-June and September-December), orders are concentrated and scheduling needs to be arranged 7-10 days in advance; Qinglong's automated production lines can operate in parallel, offering high scheduling flexibility. Curing period: standard curing takes 14 days (humidity ≥90%, temperature 20-25°C), while accelerated curing can shorten this to 7 days; Qinglong chooses flexibly based on project urgency, and accelerated curing does not affect strength.

III. Qinglong's Cycle Optimization and Project Practice

Full-process optimization improves delivery efficiency. Technology empowerment: BIM detailed design plus parametric modeling has shortened the mold design cycle by 30%; for Qinglong's Dongguan Women and Children's Activity Center project, the mold design for the complex woven texture took only 10 days. Capacity assurance: 600,000 square meters of annual capacity across 5 automated production lines, each with a daily output of ≥500 m²; Qinglong completed production of a 30,000 m² GRC curtain wall order for the Shenzhen Pingshan High-tech Zone in 35 days. Urgent order support: a green channel is open for major projects, coordinating capacity for priority production; Qinglong once delivered a 500 m² urgent order for a municipal project in 18 days. Project case: the bamboo-imitation GRC components for Hainan Changying Global 100 Fantasy Park, a medium-complexity shape, were produced and delivered in 32 days, with carving precision and texture recognized by the Luban Award.

0
What Is the Typical Production Cycle for Custom GRC Decorative Panels?
Long by picture save/share
文章推荐
Image display

Homepage     |    Products     |    Project Cases     |    News Center     |    Joins     |    About Us     |    Contact Us

 Company Address: Room 302, No. 22 Dongming Road, Shiqi District, Zhongshan City, Guangdong Province

National service hotline: 400-777-2203

Business Hotline: 0760-88706348      Mobile: 13902597531

Email address: qlfsgrc@163.com

 

 Scan to add WeChat

Copyright © Guangdong Qinglong Construction Engineering Co., Ltd. All Rights Reserved  . Recordation Number: 粤ICP备13069248号-24

Service Center

Please choose online customer service to communicate

Contacts
Contact number
13902597531
Scan a QR Code
Qrcode
Scan with WeChat
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.