The manufacturer's installation technical assurance measures cover five dimensions: professional teams, standardized processes, safety control, quality inspection, and after-sales support. Through an installation system of "professionalized teams + standardized processes + refined control", Qinglong ensures GRC component installation precision within ±2mm, a safety accident rate of 0, and a 100% installation pass rate, adapting to the needs of various construction projects.
1. Professional Installation Team and Equipment Assurance
The professional competence of the installation team is the core foundation of installation quality. Team qualifications: installation personnel must hold curtain wall construction qualifications and high-altitude work certificates, and have undergone specialized training (GRC installation techniques, safety standards); all members of the Qinglong installation team are certified for their posts, with an average of ≥5 years of industry experience. Equipment configuration: professional hoisting equipment (cranes, gondolas), measuring tools (laser rangefinders, theodolites), and fastening tools are provided to ensure installation precision and safety; the precision of Qinglong's laser rangefinders reaches ±0.1mm, ensuring accurate measurement data. Personnel allocation: installation personnel are allocated reasonably according to project scale, with a clear division of labor (surveying, hoisting, fastening, sealing); each Qinglong installation crew is staffed with 1 technical supervisor who guides the installation throughout.
2. Standardized Installation Process and Quality Control
Standardized processes prevent arbitrary installation and ensure consistency in installation quality. Preliminary preparation: on-site surveying (substrate flatness, embedded part positions), base treatment (substrate leveling, embedded part cleaning), and technical disclosure (clarifying installation requirements and joint details); Qinglong's on-site surveying error is ≤±1mm, and installation begins only after base treatment meets standards. Installation construction: measurement and setting out (line marking and positioning, deviation ≤±1mm), component hoisting (gentle handling to avoid collisions), position adjustment (laser positioning, precision ≤±2mm), fixing and fastening (connection fastening torque meeting standards), and sealing treatment (weather-resistant sealant applied to joints); Qinglong's installation process strictly follows the "Technical Standard for Application of GRC in Buildings" (JGJ/T423-2018). Quality inspection: each component is inspected during installation (position, flatness, verticality), and overall acceptance is conducted after installation (appearance quality, installation precision, sealing performance); Qinglong's installation inspection coverage rate reaches 100%, and non-conforming areas are rectified immediately.
3. Safety Control and After-Sales Support Assurance
Safety and after-sales service are important supplements to installation assurance, preventing later risks. Safety control: specialized safety plans are developed (high-altitude work protection, hoisting safety, electrical safety), safety protection equipment is provided (safety helmets, safety harnesses, protective nets), and regular safety inspections are conducted; Qinglong's installation projects have a safety accident rate of 0. After-sales support: upon completion of installation, as-built documentation (installation records, inspection reports, maintenance manuals) is provided, with regular inspections during the warranty period (connection corrosion, sealant aging, component deformation) and repair services; Qinglong provides complete as-built documentation after installation and free repairs during the warranty period. Emergency response: an emergency response mechanism has been established, with on-site handling within 48 hours of receiving installation-related repair requests; Qinglong's nationwide office coverage ensures timely and efficient emergency handling.