Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!
UHPC & GRC Complex Architecture Manufacturing
A Global Benchmark in Smart Architectural Fabrication
2025-11-20 16:21:46
Click:
The quotation from a GRC manufacturer is not a single product price, but consists of multiple parts including product cost, processing fees, mold fees, transportation fees, and service fees; some manufacturers also include taxes and quality guarantee deposits. Understanding the quotation structure can help avoid disputes such as "additional charges" later on and keep the project budget under control. Qinglong Group adopts a transparent quotation mechanism, clearly informing customers of the origin of every fee, making cooperation more reassuring.
#Core Product Cost: Raw Materials and Basic Production Expenses
Core product cost is the foundation of the quotation, covering raw material expenses and basic production expenses. Raw material expenses include the procurement costs of core components such as alkali-resistant glass fiber, high-grade cement, aggregates, and pigments; the premium alkali-resistant glass fiber and highly active cement selected by Qinglong account for over 40% of the cost. Basic production expenses include equipment energy consumption and labor costs in processes such as mixing, molding, and curing. These expenses typically account for 60%-70% of the quotation and are the core guarantee of product quality.
#Mold and Processing Fees: Additional Costs of Customization and Craftsmanship
Mold fees are an important component of quotations for customized products. Standardized products can repeatedly use existing molds, with mold fees diluted or even zero; customized products require separately designed and made molds (such as steel molds or polyurethane molds), with fees calculated based on mold complexity and service life. For Qinglong, mold fees for special-shaped components account for 10%-25% of the quotation, with complex double-curved surface molds costing even more. Processing fees are charged for special processes (such as openwork carving and fine texture treatment). For example, the bamboo-effect GRC components Qinglong made for the Hainan Changying Museum required five-axis carving processing, so additional processing fees were charged.
#Transportation and Service Fees: Necessary Expenses for Delivery and Assurance
Transportation fees are calculated based on the project location and the volume and weight of the products. Qinglong has a sales network across the country, and nearby delivery can reduce transportation costs; long-distance or overseas projects need to include logistics, customs declaration, and other fees. Service fees are charged according to customer needs: purchasing products alone incurs no service fees, but if full-chain services such as detailed design, construction and installation, and after-sales maintenance are included, service fees account for 10%-20% of the quotation. Qinglong's full-chain service quotation clearly lists details such as design fees, installation fees, and maintenance deposits, with no hidden additional charges.
#Other Fees: Taxes and Contingency Reserves
Quotations from legitimate manufacturers all include taxes such as VAT, with tax rates implemented in accordance with relevant national regulations; quotations for some large projects include a small contingency reserve (usually no more than 5%) to cover unexpected situations such as transportation damage and on-site adjustments, and unused portions can be refunded as agreed in the contract. Qinglong's quotations clearly indicate the percentages of taxes and contingency reserves, ensuring transparency.
The quotation from a GRC manufacturer is a comprehensive reflection of costs across multiple stages, and a transparent quotation structure is the foundation of cooperation. Qinglong Group adheres to "the quotation is the final price" with no hidden additional charges, allowing customers to clearly understand the purpose of every cent. Choosing a manufacturer with transparent quotations and clear itemization can effectively avoid budget risks and ensure the smooth progress of the project.