Welcome to Guangdong Qinglong Construction Engineering Co., Ltd.!
UHPC & GRC Complex Architecture Manufacturing
A Global Benchmark in Smart Architectural Fabrication
2025-11-17 17:23:55
Click:
The GRC installation stage involves high risks and demanding technical requirements; a manufacturer's comprehensive installation technical safeguards are the core prerequisite for ensuring safe, precise, and efficient installation. Identifying the core safeguards is key to evaluating a manufacturer's installation capability. Drawing on 28 years of installation practice, Qinglong analyzes the core components of an installation technical guarantee system.
I. Preliminary Installation Plan Design and Technical Disclosure
A scientific installation plan is the foundation, and the core safeguards include precise plan design and comprehensive technical disclosure. Before installation, a detailed plan must be developed based on the project site environment and component types, covering the hoisting schedule, anchoring methods, joint treatment, and safety protection; BIM technology is used to simulate the installation process to avoid collision risks in advance. For example, in the GRC cladding panel project of Guangzhou Dongzhu Shangdu Commercial City, Qinglong optimized the multi-point hanging installation plan through BIM technology to ensure structural safety. Technical disclosure sessions are organized for the installation team and on-site management personnel to clarify operating specifications, quality standards, and safety precautions, with written disclosure documents issued. Qinglong conducts no fewer than two technical disclosure sessions before each installation to ensure construction personnel thoroughly master the technical key points.
II. Installation Team Qualifications and Professional Training Safeguards
A professional installation team is the core guarantee of quality and safety and must possess the corresponding qualifications and skill levels. Installation personnel must hold construction special operation certificates (such as lifting machinery operation certificates and work-at-height certificates), and the team must have installation experience in large GRC projects. Qinglong's installation team has an average of more than 5 years of industry experience and holds complete qualification certificates. Regular professional training is conducted, covering skills such as component hoisting, anchoring installation, sealing treatment, and safety protection, along with emergency response drills to enhance the team's emergency handling capability. Qinglong organizes installation technical training and safety drills every month to ensure the team's technical level meets standards. For example, in the Shenzhen Yirui Biotechnology Building GRC project, the professional team efficiently completed the installation of complex components with no safety accidents.
III. Quality and Safety Control Measures During Installation
Whole-process control is key to ensuring installation quality and safety; the core measures include precise positioning, real-time testing, and safety protection. Three-dimensional laser scanning positioning technology is adopted to ensure that component installation position deviation is ≤±2mm and verticality deviation is ≤1mm/m. In the double-curved GRC installation at the Guangxi New Media Center, Qinglong achieved seamless splicing through precise positioning. During installation, indicators such as anchoring force and component flatness are tested in real time, with a sampling test conducted for every 10 components installed, and any non-conforming items rectified immediately. A comprehensive safety protection system is established, including scaffolding erection, safety belt use, and hoisting equipment inspection, with safety warning signs in place. Qinglong's installation sites implement a "daily safety inspection" system to promptly eliminate safety hazards and ensure zero accidents during the installation process.
IV. Post-Installation Acceptance and After-Sales Safeguards
Post-installation acceptance and after-sales service are key to closed-loop management; the safeguards include strict acceptance, thorough protection, and after-sales response. After installation is completed, acceptance is carried out in accordance with specifications, covering testing of indicators such as appearance quality, dimensional deviation, and anchoring firmness, with an acceptance report issued. Qinglong's installed projects achieve an acceptance pass rate above 99%. Completed GRC components are given finished-product protection, such as covering with protective film and installing protective railings, to avoid collision damage. A rapid after-sales response mechanism is established so that issues arising after installation, such as dimensional deviation or sealant detachment, receive a response and handling within 24 hours. Qinglong provides 1 year of free maintenance service after installation to ensure stable use of the components. Comprehensive installation technical safeguards reflect the manufacturer's professional strength and sense of responsibility, and are the core guarantee for successful project delivery.